Neemuch Nasirabad State Railway: Difference between revisions
Jump to navigation
Jump to search
mNo edit summary |
Fully checked; Further Info added with link, text and links corrected |
||
Line 1: | Line 1: | ||
The '''Neemuch Nasirabad State Railway''' connected [[Neemuch]] to [[Ajmer]], the construction was started in 1879, and the work completed in March 1881. | |||
In 1881-82, the '''Rajputana-Malwa State Railway''' (RMSR) was created amalgamating, under single management, existing State Railways:- | In 1881-82, the '''[[Rajputana-Malwa State Railway]]''' (RMSR) was created amalgamating, under single management, existing State Railways:- | ||
*[[Rajputana State Railway]] (RSR) | *[[Rajputana State Railway]] (RSR) | ||
*[[Holkar State Railway]], which had opened 1874 from Khandwa reaching Indore, 1876. | *[[Holkar State Railway]], which had opened 1874 from Khandwa reaching Indore, 1876. | ||
Line 11: | Line 11: | ||
In 1900 the RMSR was merged into the [[Bombay, Baroda and Central India Railway]](BB&CIR), becoming the latter's Metre Gauge([[Rail_gauge_#Metre_Gauge|MG]]) section; known as Ratlam Division of BB&CIR.. | In 1900 the RMSR was merged into the [[Bombay, Baroda and Central India Railway]](BB&CIR), becoming the latter's Metre Gauge([[Rail_gauge_#Metre_Gauge|MG]]) section; known as Ratlam Division of BB&CIR.. | ||
==Further Information== | |||
See '''[[Rajputana-Malwa State Railway]]''' and '''[[Bombay, Baroda and Central India Railway]]''' | |||
[[Category:Railways]] | [[Category:Railways]] | ||
[[Category:Indian States Railways]] | [[Category:Indian States Railways]] |
Revision as of 06:08, 10 February 2016
The Neemuch Nasirabad State Railway connected Neemuch to Ajmer, the construction was started in 1879, and the work completed in March 1881.
In 1881-82, the Rajputana-Malwa State Railway (RMSR) was created amalgamating, under single management, existing State Railways:-
- Rajputana State Railway (RSR)
- Holkar State Railway, which had opened 1874 from Khandwa reaching Indore, 1876.
- Scindia-Neemuch Railway from Indore to Nimach, including a branch line from Indore to Ujjain opened in August 1876 . The entire line was completed in 1879-80
- Neemuch Nasirabad State Railway
- Western Rajputana State Railway, known to have existed but no information found.
All these railways were worked by Bombay, Baroda and Central India Railway(BB&CIR) State Railways; all worked by BB&CIR.
In 1900 the RMSR was merged into the Bombay, Baroda and Central India Railway(BB&CIR), becoming the latter's Metre Gauge(MG) section; known as Ratlam Division of BB&CIR..
Further Information
See Rajputana-Malwa State Railway and Bombay, Baroda and Central India Railway