User:PEA-2292/My sandbox: Difference between revisions

From FIBIwiki
Jump to navigation Jump to search
PEA-2292 (talk | contribs)
Blanked the page
PEA-2292 (talk | contribs)
No edit summary
Line 1: Line 1:
[[File: Bengal-Nagpur Railway Railway Map 1909.png|thumb| Bengal-Nagpur Railway Map 1909]]


'''Bengal-Nagpur Railway - Lines Owned and Worked'''
<blockquote>- a sub-section of the '''[[Bengal-Nagpur Railway]]'''(BNR) page</blockquote>
The [[Bengal-Nagpur Railway ]](BNR) owned and operated an extensive network of railways of broad gauge ([[Rail_gauge#Broad_Gauge|BG]]) and  2ft 6in/762mm narrow gauge ([[Rail_gauge#Narrow_Gauge|NG]]) railways.
By 1918 there was total of 2,795 miles(4,498km) of open lines in the BNR system - this comprised:-
*1,888 miles(3,038km) of BG lines
*907 miles(1,468km) of NG.
*A further 328 miles(528km) were under construction - 266 miles(428km) of BG and 62 miles(100km) of NG.
The BNR also managed, worked and maintained a number of lines on behalf of other parties.
==BNR Broad Gauge (BG) Network==
===1918 BG Network===
The listing below is based on the “Administration Report on Railways 1918” 
<ref>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n9/mode/1up  " Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government  Printing,  Calcutta;  pages 1-3]; Retrieved 22 Dec 2017</ref>
*'''BNR Main Line''' [[Asansol]] to [[Nagpur]]; 630 miles (1,014km); fully opened as BG by 1891. The [[Nagpur Chhattisgarh Railway]] in 1880-83 opened the '[[Nagpur]] to Rajnandgaon Section', 144 miles(232km) as MG, converted to BG in 1888.
**'''Sanctoria Coal Branch''' Damodaodar to Sanctoria Collieries; opened 1889; 8 miles(13km)
**'''Chaurashi Branch''' Ramkanali to Nodila Colliery; opened 1903; 9 miles(14km)
**'''Sambalpur Branch''' Jharauguda to Sambalpar; opened 1893; 30 miles(48km)
**'''Katni Branch''' [[Bilaspur]] via [[Katni]] to the GIPR Marwara Junction; fully opened 1891; 197 miles(316km). This was the former [[Bilaspur-Etawa Provincial State Railway]]. The [[Katni-Umaria Provincial State Railway]] in 1886 had opened Katni to Umaria section, 36 miles(58km)
**'''Kanham-Dattapahar Spur'''; opened 1907; 17 miles(28km)
**'''Calcutta Extension Line''' Sini to [[Howrah]]; opened 1900; 171 miles(274km)
**'''Fort Gloster; Lawrence Mill; East Loop Narin Bank and Kidderpore Lines; opened 1900; 4 miles(6.4km)
**'''Fuleshwar Ring Mill Line; opened 1917; 0.4 mile(0.7km)
**'''Shalimar Branch''' Santragachi to Shalimar; opened 1901; 3.1 miles(5km)
**'''Cuttack Extension''' Khargpur to [[Cuttack]]; opened 1898-99; 182 miles(292km)
**'''Jharia Extension''' Khargpur to Midnapur, opened 1901; to Bhojudih, 1903; to Gomoh, 1907; to Bhowrah, 1914. Total 151 miles(243km)
**'''Jhariah Coalfields Spurs''' ‘Bhojudih-Bhaga-Mounuda Loop’, opened 1903-04; ‘Bhowra Spur’, opened 1903; ‘Bhojudih-Pathardihi Link’, opened 1906 and extended 1915. Total 22 miles(35km);
**'''Nonoodih BNR-EIR Connection''', opened 1915, 1.4 miles(2.3km)
**'''Katras Connections''' Malkera to Katras, opened 1903; Khanoodih to Katras, opened 1907. Total 2.5 miles(4km)
**'''Murulidih Branch''' Mohuda to Murulidih Collieries, opened 1907, 2.7 miles(4.3km)
**'''Jamadoba Loop''', opened 1903, 5.4 miles(8.7km)
**'''Aldih Branch''', opened 1906, 2.5 miles(4km)
**'''Visianagram-Parvatipuram Extension''' Visianagram to Bobbili, opened 1908; Bobbili to Parvatipuram, opened 1900. Total 48 miles(77km)
**'''Bobbili-Salur Branch''' Bobbilli to Salur, opened 1913, 10 miles(16km)
**'''Kalimati-Gorumahisani Extension''', Kalimati (later to become Tatanagar Junction) to Gorumahisani , opened 1911, 40 miles(64km). The [[Badampahar Iron Mine Railway|‘Badampahar Spur’]] extended the line to the Badamphar Iron Mines in about 1922
**'''Bokharo Ramgarh Extension''' Mghuda via Jamuniatand to the BNR/EIR joint line, opened 1913-15. Total 22 miles(35km).
**'''Kalamna-Itsari-Nagpur Section''' Kalamna via Itsari to [[Nagpur]], opened 1911, 4 miles(6.4km)
*'''BNR East Coast Railway Northern Section''' [[Cuttack]] to [[Waltair]] formerly part of the [[ East Coast State Railway]], opened 1894-97, 321 miles(516km)
**'''Naupuda Salt Branch''' ''included in above''
**'''Puri Branch''' ''included in above'' 
===BG Lines under construction as at 1918===
*'''Raipur to Parvatipuram''', sanctioned 1906, 261 miles(420km)
*'''Kandra to Gomharia Chord''', sanctioned 1914, 5.5 miles(8.9km)
*''' [[Panposh-Ruipura Railway]]''', sanctioned 1917, constructed and worked by BNR opened 1919-20, 14 miles(23km)
===Later BG extensions after 1918===
*'''Raipur-Vizianagram BNR Branch''', opened in 1931. Originally surveyed in 1879-82 but not constructed, then known as the [[Vizagapatam-Raipur Railway]]
*'''[[Anuppur-Manendragarb-Chimiri Railway]]''', opened 1939 by BNR; built primarily to convey coal from the Kotma area
===BG Lines worked by BNR===
*''' [[Bellary-Kistna State Railway]] ''', constructed before 1890; surveyed for Hindpur extension 1892-94; worked by BNR.
*''' [[Ganjam District Light Railway]] ''', surveyed 1899 but did not go ahead in entirety; Parlakimedi Light Railway opened 1 section, 1900 worked by BNR from 1902.
*''' [[Kamptee-Deolapar-Ramtek Railway]] ''', surveyed 1903 to construct light railway on public roads to convey Manganese; worked by BNR(qv); no further information
*''' [[Pench Valley Coalfield Railway]] ''', opened 1906-7; 2ft 6in/762mm narrow gauge([[Rail_gauge#Narrow_Gauge|NG]])line, from the Pench and Kanhan coalfields to [[Chhindwara]] where it connected to  the  (BNR) [[Satpura Railway]] network; worked by BNR.
*''' [[Baripada-Talbond Railway]] ''', opened 1920, extension to [[Mayurbhanj Railway]]; worked by BNR.
*''' [[Visakhapatnam Port Trust Railway]] ''', inner harbour railway, built by BNR 1927-33 to export manganese ore.
*''' [[Central  Indian Coalfields Railway]] ''', opened 1927, [[Government of India |GoI]] owned; part worked by BNR; later amagamated with [[East Indian Railway]](EIR)
==BNR Narrow Gauge (NG) Network==
The listing below is based on the “Administration Report on Railways 1918” 
<ref>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n15/mode/1up  " Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government  Printing,  Calcutta;  pages 6-11]; Retrieved 22 Dec 2017</ref>
''' ''See separate pages for detail.'' '''
===BNR 2ft 6in/762mm Narrow Gauge Lines===
*[[Raipur-Dhamtari Railway]] and [[Rajim Branch Railway]]. The first 2ft 6in/762mm narrow gauge([[Rail_gauge#Narrow_Gauge|NG]]) branch of BNR, opened 1900 and extended to Rajim 1906. Total 57 miles(92km)
*[[Purulia Ranchi Light Railway]]. BNR NG line, opened 1907 and extended 1913. Total 115 miles(185km)
*[[Satpura Railway]]. NG network. Developed by the BNR from 1904 onward, eventually being described as the ‘Satpura Railway’; connected Jubbulpore with Gondia, Mandla Fort, Chhindwara and Nagpur; later extended. Comprising: -
**[[Jubbulpore-Gondia Railway]]. NG extension, opened 1903-13, owned by GoI,  worked by BNR. Total 311 miles(501km)
**[[Gondia-Chanda Railway]]. NG extension, opened 1908-16. Total 217 miles(349km)
**[[Nagbhir-Nagpur Branch Railway]], opened 1908. Total 66 miles(106km)
**[[Nagpur-Chhindwara Railway]]. NG extension, opened 1911, owned by GoI and worked by BNR. Total 97 miles(156km)
**[[Tumsar-Tirodi Light Railway]]. 2ft 0in/610mm narrow gauge([[Rail_gauge#Narrow_Gauge|NG]]); opened 1910 as ‘Tumsar-Katangi Railway’ owned by Central India Mining Co ; Purchased in 1916-17 by [[Government of India |GoI]];  worked by BNR; connecting to BNR's [[Satpura Railway]].
===NG Lines worked by BNR===
*[[Parlakimedi Light Railway]], 2ft 6in/762mm NG;  owned by Raja of Parlakimedi, opened  1900, worked by BNR, 25 miles(39km).
*[[Mourbhanj Railway|Mourbhanj State Railway]], 2ft 6in/762mm (NG); owned by Mourbhanj State, opened 1905, worked by BNR, 32 miles(km). Renamed [[Mayurbhanj Railway]] 1920 and transferred  to private company.

Revision as of 08:47, 24 December 2017

Bengal-Nagpur Railway Map 1909

Bengal-Nagpur Railway - Lines Owned and Worked

- a sub-section of the Bengal-Nagpur Railway(BNR) page

The Bengal-Nagpur Railway (BNR) owned and operated an extensive network of railways of broad gauge (BG) and 2ft 6in/762mm narrow gauge (NG) railways.

By 1918 there was total of 2,795 miles(4,498km) of open lines in the BNR system - this comprised:-

  • 1,888 miles(3,038km) of BG lines
  • 907 miles(1,468km) of NG.
  • A further 328 miles(528km) were under construction - 266 miles(428km) of BG and 62 miles(100km) of NG.

The BNR also managed, worked and maintained a number of lines on behalf of other parties.

BNR Broad Gauge (BG) Network

1918 BG Network

The listing below is based on the “Administration Report on Railways 1918” [1]

  • BNR Main Line Asansol to Nagpur; 630 miles (1,014km); fully opened as BG by 1891. The Nagpur Chhattisgarh Railway in 1880-83 opened the 'Nagpur to Rajnandgaon Section', 144 miles(232km) as MG, converted to BG in 1888.
    • Sanctoria Coal Branch Damodaodar to Sanctoria Collieries; opened 1889; 8 miles(13km)
    • Chaurashi Branch Ramkanali to Nodila Colliery; opened 1903; 9 miles(14km)
    • Sambalpur Branch Jharauguda to Sambalpar; opened 1893; 30 miles(48km)
    • Katni Branch Bilaspur via Katni to the GIPR Marwara Junction; fully opened 1891; 197 miles(316km). This was the former Bilaspur-Etawa Provincial State Railway. The Katni-Umaria Provincial State Railway in 1886 had opened Katni to Umaria section, 36 miles(58km)
    • Kanham-Dattapahar Spur; opened 1907; 17 miles(28km)
    • Calcutta Extension Line Sini to Howrah; opened 1900; 171 miles(274km)
    • Fort Gloster; Lawrence Mill; East Loop Narin Bank and Kidderpore Lines; opened 1900; 4 miles(6.4km)
    • Fuleshwar Ring Mill Line; opened 1917; 0.4 mile(0.7km)
    • Shalimar Branch Santragachi to Shalimar; opened 1901; 3.1 miles(5km)
    • Cuttack Extension Khargpur to Cuttack; opened 1898-99; 182 miles(292km)
    • Jharia Extension Khargpur to Midnapur, opened 1901; to Bhojudih, 1903; to Gomoh, 1907; to Bhowrah, 1914. Total 151 miles(243km)
    • Jhariah Coalfields Spurs ‘Bhojudih-Bhaga-Mounuda Loop’, opened 1903-04; ‘Bhowra Spur’, opened 1903; ‘Bhojudih-Pathardihi Link’, opened 1906 and extended 1915. Total 22 miles(35km);
    • Nonoodih BNR-EIR Connection, opened 1915, 1.4 miles(2.3km)
    • Katras Connections Malkera to Katras, opened 1903; Khanoodih to Katras, opened 1907. Total 2.5 miles(4km)
    • Murulidih Branch Mohuda to Murulidih Collieries, opened 1907, 2.7 miles(4.3km)
    • Jamadoba Loop, opened 1903, 5.4 miles(8.7km)
    • Aldih Branch, opened 1906, 2.5 miles(4km)
    • Visianagram-Parvatipuram Extension Visianagram to Bobbili, opened 1908; Bobbili to Parvatipuram, opened 1900. Total 48 miles(77km)
    • Bobbili-Salur Branch Bobbilli to Salur, opened 1913, 10 miles(16km)
    • Kalimati-Gorumahisani Extension, Kalimati (later to become Tatanagar Junction) to Gorumahisani , opened 1911, 40 miles(64km). The ‘Badampahar Spur’ extended the line to the Badamphar Iron Mines in about 1922
    • Bokharo Ramgarh Extension Mghuda via Jamuniatand to the BNR/EIR joint line, opened 1913-15. Total 22 miles(35km).
    • Kalamna-Itsari-Nagpur Section Kalamna via Itsari to Nagpur, opened 1911, 4 miles(6.4km)
  • BNR East Coast Railway Northern Section Cuttack to Waltair formerly part of the East Coast State Railway, opened 1894-97, 321 miles(516km)
    • Naupuda Salt Branch included in above
    • Puri Branch included in above

BG Lines under construction as at 1918

  • Raipur to Parvatipuram, sanctioned 1906, 261 miles(420km)
  • Kandra to Gomharia Chord, sanctioned 1914, 5.5 miles(8.9km)
  • Panposh-Ruipura Railway, sanctioned 1917, constructed and worked by BNR opened 1919-20, 14 miles(23km)

Later BG extensions after 1918

BG Lines worked by BNR

BNR Narrow Gauge (NG) Network

The listing below is based on the “Administration Report on Railways 1918” [2]

See separate pages for detail.

BNR 2ft 6in/762mm Narrow Gauge Lines

NG Lines worked by BNR