Dholpur-Bari Light Railway: Difference between revisions

From FIBIwiki
Jump to navigation Jump to search
PEA-2292 (talk | contribs)
'transferred to Gwalior Light Railway(GLR)' deleted - no evidence
PEA-2292 (talk | contribs)
Revised page with info from Steve Moore's BL research
Line 31: Line 31:
}}
}}


The [[Dholpur-Bari Light Railway]] (DBLR) was first described in the [[Imperial Gazetteer of India]], 1908 as the '''Bari-Dholpur Tramway''' a ‘light steam tramway’ under construction to carry red sandstone from Bari to the Dholpur to connect with the [[Indian Midland Railway|Indian Midland]] section of the [[Great Indian Peninsula Railway]] (GIPR) <ref>[http://dsal.uchicago.edu/reference/gazetteer/pager.html?objectid=DS405.1.I34_V11_333.gif "Imperial Gazetteer of India", v. 11, p. 327; 1908]; Retrieved 23 Aug 2016</ref>
'''[[Dholpur-Bari Light Railway]]''', also called the  '''Dholpur State Railway''' in some records.


Later renamed the '''Dholpur State Railway''', the DBLR was a 2ft 6in/762mm narrow gauge([[Rail_gauge#Narrow_Gauge|NG]]) line owned and managed by the [[Princely states|Princely ]][[Dholpur State]] Durbar. The line ran from its junction at [[Dholpur]] on the GIPR mainline from [[Jhansi]] to [[Agra]] to Bari , a length of 19 miles(31km)and opened in Feb 1908. The line was extended a further 16 miles(26km) to reach Tantpur in 1914 <ref name=Admin>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n233/mode/1up  "Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government  Printing, Calcutta; page 225]; Retrieved 23 Aug 2016</ref>
The [[Dholpur-Bari Light Railway]] (DBLR) was first described in the [[Imperial Gazetteer of India]], 1908  as the '''Bari-Dholpur Tramway''' a ‘light steam tramway’ under construction to carry red sandstone from [[Bari]] to [[Dholpur]] to connect with the [[Indian Midland Railway|Indian Midland]] section of the [[Great Indian Peninsula Railway]] (GIPR) <ref>[http://dsal.uchicago.edu/reference/gazetteer/pager.html?objectid=DS405.1.I34_V11_333.gif "Imperial Gazetteer of India", v. 11, p. 327; 1908]; Retrieved 15 Apr 2018</ref>  


The [[Mohari-Karauli Railway]] was constructed by the Imperial Delhi Committee for the carriage of stone for New Delhi from Karauli (in some records Barauli) to Mohari Junction. The 2ft 6in/762mm ([[Rail_gauge#Narrow_Gauge|NG]]) line opened in Feb 1917 and was managed, maintained and worked by the Dholpur Durbar in conjunction with the DBLR <ref name=Admin/>.  
[[File:Dholpur-Bari Light Railway.png|thumb|''' Dholpur-Bari Light Railway'''. Map from British Library IOR/V/10/1102 “Annual Administration Report of Dholpur State for Year ending 30 Sept 1910”. Photographed with permission from the 'Railway Section' of the above report.<br>The map shows the [[GIPR]] [[Agra]] - [[Gwalior]] mainline as it passes through [[Dholpur State]] and the [[Dholpur-Bari Light Railway]] and marked up to show later extensions.]]


The line was further extended to reach Sirmuttra in 1929 <ref>[http://timesofindia.indiatimes.com/city/jaipur/At-Dholpur-the-train-arrives-at-your-door/articleshow/48677208.cms Times of India “At Dholpur the train arrives at your door”, 26 Aug 2015]; Retrieved 23 Aug 2016</ref>
The DBLR was a 2ft 6in/762mm narrow gauge([[Rail_gauge#Narrow_Gauge|NG]]) line owned and managed by the [[Princely states|Princely]] [[Dholpur State]] Durbar. The line ran from an interchange at [[Dholpur]] on the [[Great Indian Peninsula Railway]](GIPR) mainline to [[Bari]], a length of 19 miles(31km) and opened in Feb 1908 <ref name=Admin>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n233/mode/1up  "Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government  Printing,  Calcutta;  page 225]; Retrieved 15 Apr 2018</ref>.
 
==Narpura Quarry Siding==
The quarry at Narpura, 4 miles north-west of [[Dholpur]], was connected to the DBLR by a railway siding and was the source of red sandstone used for building purposes. It is fine grained, easily worked, hardens by exposure and does not deteriorate by lamination 
<ref>[http://dsal.uchicago.edu/reference/gazetteer/pager.html?objectid=DS405.1.I34_V11_333.gif "Imperial Gazetteer of India", v. 11, p. 327.]; Retrieved 15 Apr 2018</ref>.
 
==Tantpur Extension Railway==
The '''Tantpur Extension Railway''' was a NG extension of  a further 16 miles(26km) in a north-westerly direction from [[Bari]] reaching [[Baseri]] in Sep 1913 and on to [[Tantpur]] in July 1914 <ref name=Admin/>. 
 
==Mohari-Barauli Railway==
The '''[[Mohari-Barauli Railway]]''' was a NG line, with a length of 15 miles(24km) that  opened in Feb 1917. The line was  constructed by the [[Imperial Delhi Committee]] for the carriage of stone for [[Delhi|Delhi (later to be named New Delhi)]] from quarries at [[Barauli]] and was managed, maintained and worked by the [[Dholpur State]] Durbar in conjunction with the DBLR <ref name=Admin/>. 
<br> From [[Barauli]] the line ran to Mohari Junction, 5 miles(8km) north-west of [[Bari]], where it joined the [[Rail_gauge#Narrow_Gauge|narrow gauge NG]]  DBLR line to [[Dholpur]] . At [[Dholpur]] there was an interchange to the [[GIPR]] [[Rail_gauge#Broad_Gauge|broad gauge BG line ]] to [[Agra]] and onward to [[Delhi]]. 
<br>''See also'' '''[[Delhi Imperial Construction Railways]]''' ''for further information''
 
==Simuttra Extension Railway==
The '''Simuttra Extension Railway'''  line was extended from [[Barauli]] a further 3½ miles(6km) westward to reach [[Sir Muttra|Sirmuttra(Sir Muttra)]] in 1929 <ref>[http://timesofindia.indiatimes.com/city/jaipur/At-Dholpur-the-train-arrives-at-your-door/articleshow/48677208.cms Times of India “At Dholpur the train arrives at your door”, 26 Aug 2015]; Retrieved 23 Aug 2016</ref>


In 1950, the DBLR was nationalised and in 1951 merged with others to form [[Central Railway]], a zone of [[Indian Railways]].
In 1950, the DBLR was nationalised and in 1951 merged with others to form [[Central Railway]], a zone of [[Indian Railways]].

Revision as of 07:10, 17 April 2018

Dholpur-Bari Light Railway
[[Image:|150px| ]]
Line of route
Dholpur to Tantpur
Gauge / mileage
2' 6" NG 55 miles (1944)
Timeline
1908 Dholpur to Bari section opened
1914 Bari to Tantpur section opened
1950 Nationalised
1951 Part of Central Railway (IR zone)
Key locations
Presidency Bengal
Stations Dholpur, Bari, Baseri, Tantpur
System agency
1908-1950 Own agency
How to interpret this infobox

Dholpur-Bari Light Railway, also called the Dholpur State Railway in some records.

The Dholpur-Bari Light Railway (DBLR) was first described in the Imperial Gazetteer of India, 1908 as the Bari-Dholpur Tramway a ‘light steam tramway’ under construction to carry red sandstone from Bari to Dholpur to connect with the Indian Midland section of the Great Indian Peninsula Railway (GIPR) [1]

Dholpur-Bari Light Railway. Map from British Library IOR/V/10/1102 “Annual Administration Report of Dholpur State for Year ending 30 Sept 1910”. Photographed with permission from the 'Railway Section' of the above report.
The map shows the GIPR Agra - Gwalior mainline as it passes through Dholpur State and the Dholpur-Bari Light Railway and marked up to show later extensions.

The DBLR was a 2ft 6in/762mm narrow gauge(NG) line owned and managed by the Princely Dholpur State Durbar. The line ran from an interchange at Dholpur on the Great Indian Peninsula Railway(GIPR) mainline to Bari, a length of 19 miles(31km) and opened in Feb 1908 [2].

Narpura Quarry Siding

The quarry at Narpura, 4 miles north-west of Dholpur, was connected to the DBLR by a railway siding and was the source of red sandstone used for building purposes. It is fine grained, easily worked, hardens by exposure and does not deteriorate by lamination [3].

Tantpur Extension Railway

The Tantpur Extension Railway was a NG extension of a further 16 miles(26km) in a north-westerly direction from Bari reaching Baseri in Sep 1913 and on to Tantpur in July 1914 [2].

Mohari-Barauli Railway

The Mohari-Barauli Railway was a NG line, with a length of 15 miles(24km) that opened in Feb 1917. The line was constructed by the Imperial Delhi Committee for the carriage of stone for Delhi (later to be named New Delhi) from quarries at Barauli and was managed, maintained and worked by the Dholpur State Durbar in conjunction with the DBLR [2].
From Barauli the line ran to Mohari Junction, 5 miles(8km) north-west of Bari, where it joined the narrow gauge NG DBLR line to Dholpur . At Dholpur there was an interchange to the GIPR broad gauge BG line to Agra and onward to Delhi.
See also Delhi Imperial Construction Railways for further information

Simuttra Extension Railway

The Simuttra Extension Railway line was extended from Barauli a further 3½ miles(6km) westward to reach Sirmuttra(Sir Muttra) in 1929 [4]

In 1950, the DBLR was nationalised and in 1951 merged with others to form Central Railway, a zone of Indian Railways.

References