Difference between revisions of "East Indian Railway - Lines owned and worked"

From FIBIwiki
Jump to navigation Jump to search
(1937 Map added)
(BG Lines absorbed into EIR: 'Thanesar-Kaithal Railway' and 'Delhi-Umballa-Kalka Railway' after 1926 info added)
Line 83: Line 83:
 
*[[Barharwa-Azimganj-Katwa Railway]], opened c.1914 as a Branch/Link line from [[Katwa]] on the [[Hooghly-Katwa Railway]] to [[Barharwa]] on the [[Sahibganj Loop EIR Line|Sahibganj Loop]]. This 110 Mile (170km) track was worked by EIR.
 
*[[Barharwa-Azimganj-Katwa Railway]], opened c.1914 as a Branch/Link line from [[Katwa]] on the [[Hooghly-Katwa Railway]] to [[Barharwa]] on the [[Sahibganj Loop EIR Line|Sahibganj Loop]]. This 110 Mile (170km) track was worked by EIR.
 
*[[Central Indian Coalfields Railway]], opened 1927. [[Government of India |GoI]] owned; part worked by [[Bengal Nagpur Railway]](BNR); later amagamated with EIR.  
 
*[[Central Indian Coalfields Railway]], opened 1927. [[Government of India |GoI]] owned; part worked by [[Bengal Nagpur Railway]](BNR); later amagamated with EIR.  
*[[Delhi-Umballa-Kalka Railway]], formed 1889 as private company, [[Delhi]] to [[Kalka],] line opened 1891, 162 miles(259km), worked and maintained by EIR. Page 60 (pdf68). Merged into EIR, 1925
+
*[[Delhi-Umballa-Kalka Railway]], formed 1889 as private company, [[Delhi]] to [[Kalka]], line opened 1891, 162 miles(259km), worked and maintained by EIR. Page 60 (pdf68) Until 1925, then by [[North Western Railway]](NWR).  
 
*[[Deoghur Railway]] ; Jasidih to Baidyanathdham, 1882, a short branch line linking important pilgrimage centre to the EIR main line; metre gauge([[Rail_gauge_#Metre_Gauge|MG]]) constructed and worked by [[Burn & Co Ltd]]; merged into EIR, 1911 becoming the ‘Deoghur Branch Line’ of the  [[Howrah-Delhi EIR Main Line]].  4.1 miles(6.6km).  Page 54 (pdf 63)   
 
*[[Deoghur Railway]] ; Jasidih to Baidyanathdham, 1882, a short branch line linking important pilgrimage centre to the EIR main line; metre gauge([[Rail_gauge_#Metre_Gauge|MG]]) constructed and worked by [[Burn & Co Ltd]]; merged into EIR, 1911 becoming the ‘Deoghur Branch Line’ of the  [[Howrah-Delhi EIR Main Line]].  4.1 miles(6.6km).  Page 54 (pdf 63)   
 
*[[Dildarnagar-Ghazipur State Railway]], opened 1880 as a provincial state railway, worked by EIR and later absorbed into the EIR network becoming the Tari Ghat Branch Line of the [[Howrah-Delhi EIR Main Line]]  ; Dildarnager to Tari Ghat, 1880; 12 miles(19km. Page 54 (pdf 63)
 
*[[Dildarnagar-Ghazipur State Railway]], opened 1880 as a provincial state railway, worked by EIR and later absorbed into the EIR network becoming the Tari Ghat Branch Line of the [[Howrah-Delhi EIR Main Line]]  ; Dildarnager to Tari Ghat, 1880; 12 miles(19km. Page 54 (pdf 63)
Line 93: Line 93:
 
*[[Oudh and Rohilkhand Railway]](O&RR), formed from [[Indian Branch Railway]](IBR); nationalised, 1889; merged into EIR, 1925.
 
*[[Oudh and Rohilkhand Railway]](O&RR), formed from [[Indian Branch Railway]](IBR); nationalised, 1889; merged into EIR, 1925.
 
*[[South Bihar Railway]], formed 1895 as private company,  [[Luckeeserai]] to [[Gaya]], 79 miles(127km) opened 1899, leased to the State to be worked as part of the EIR network. The railway was taken over by the Government of India([[Government of India |GoI]]) in 1906.
 
*[[South Bihar Railway]], formed 1895 as private company,  [[Luckeeserai]] to [[Gaya]], 79 miles(127km) opened 1899, leased to the State to be worked as part of the EIR network. The railway was taken over by the Government of India([[Government of India |GoI]]) in 1906.
*[[Thanesar-Kaithal Railway]], a branch line of the [[Delhi-Umballa-Kalka Railway]], opened 1909-10, 30 miles(48km) branch from Kurukshetra to Kathal, worked and maintained by EIR. Page 60 (pdf68).
+
*[[Thanesar-Kaithal Railway]], a branch line of the [[Delhi-Umballa-Kalka Railway]], opened 1909-10, 30 miles(48km) branch from Kurukshetra to Kathal, worked and maintained by EIR up to 1925,Page 60 (pdf68). Then by [[North Western Railway]] from 1926.
  
 
==BG Lines worked by EIR at some time==
 
==BG Lines worked by EIR at some time==

Revision as of 08:12, 15 June 2020

East Indian Railway - Lines owned and worked

- a sub-section of the East Indian Railway(EIR) page

East Indian Railway Map 1909, east section - Howrah (Calcutta) to Gaya
East Indian Railway Map 1909, mid section__ - Gaya to Cawnpore
East Indian Railway Map 1909, west section - Cawnpore to Delhi
EIR Railway System 1937 Map

East Indian Railway(EIR) owned and operated an extensive network of railways of broad gauge(BG);, in 1905 the route mileage was 1962 miles(3157km) and by 1918 was 2775 miles( 4465km)

The EIR also managed, worked and maintained a number of lines on behalf of other parties.

The listings below are generally based on the “Administration Report on Railways 1918” [1] with page numbers (and pdf pages) noted at the end of each entry.

BG Lines - owned and worked by EIR

1918 Total - 2464 miles(3965km). Page 53 (pdf 62)

  • Howrah-Delhi EIR Main Line; first section Howrah to Hooghly, 24 miles(38km,) opened 1854; via Khana Junction-Bhagalpur-Jamalpur-Luckeesera-Mogul Sarai to Allahabad, 1865; reaching Delhi on 1 Jan 1867. 1021 miles(1643km). Page 53 (pdf 62)
    • First Chord EIR Line ; Khana Junction-Sitarampur, opened in stages from 1855-63; reaching Luckeeserai 1871. 183 miles(294km. Page 53 (pdf 62). Initially called the Chord Line but then re-designated as the Main Line.
    • Sahibganj Loop EIR Line; Khana Junction-Bhagalpur-Jamalpur-Luckeeserai section of the Main Line 250 miles(402km) became secondary with the opening of the First Chord, reducing Howrah-Delhi to 943 miles (1517km). Page 53 (pdf 62)
    • Bausi Branch Railway, a branch railway from Bhagalpur to Mandar Hill; under construction 1907 for EIR as a branch of the Sahibganj Loop EIR Line; dismantled in 1917-18 for reasons unknown.
  • Grand Chord EIR Line; Sitarampur-Gaya-Mogul Sarai, first section to Barakar , 1865; Gaya 1906; Mogul Sarai 1909. 278 miles(447km). Page 54 (pdf 63)
  • Howrah-Burdwan Chord Railway ; 6 miles from Howrah to Saktighar, 1917; 45 miles(72km). Page 54 (pdf 63)

Branches from the Howrah-Delhi EIR Main Line

Alphabetical order with page and pdf references from the “1918 Report on Railways” ” [1] and IOR source[2].

    • ‘Agra Branch Line’ ; Tundla to Jumna Bridge, 1862; Jumna Bridge to Agra City, 1907; total 15 miles(24km). Page 55 (pdf64)
    • ‘Allahabad Fort Branch Line’ ; Allahabad Fort, 1859; 2.3 miles(3.7km), Page 55 (pdf64); extension to Daraganj sanctioned 1914, 1.9 miles(3km), Page 56(pdf65)
    • ‘Bandel-Barharwa Branch Line’ ; Bandel to Barharwa, 1911-13; 166 miles(267km). Page 54 (pdf 63)
    • ‘Benares Branch ‘ - the branch railway from the Mogul Serai station, on the main line of the EIR to the right bank of the River Ganges, opposite Benares . This date of opening of this branch is not known, on 1 Oct 1887 the branch of the Dufferin Bridge by the Oudh and Rohilkhand Railway(O&RR) on the 16 Dec 1887. [2]. This would probably have made this branch line redundant but not confirmed
    • ‘Benares Chord Line ‘; to Bechupur, connecting to the Oudh and Rohilkhand Railway, 1910; 1.2 miles(1.9km). Page 54 (pdf 63)
    • ‘Bhadreswar Branch Line’ ; Bhadreswar to River Bank, 1882; 2.6 miles(4.2km). Page 54 (pdf 63). A branch line of railway from the EIR station at Bhadreswar to the right bank of the River Hughli at Pulta Ghat [2]
    • ‘Cawnpore City Branch Line’ ; Cawnpore, 1879; 0.9 miles(1.4km). Page 55 (pdf64)
    • ‘Deoghar Branch Line’ ; Jasidih to Baidyanathdham, opened 1882 as the metre gauge (MG) MG Deoghur Railway, originally owned and worked by Burn & Co Ltd until merged in EIR, 1911; converted to BG 1913; 4.1 miles(6.6km). Page 54 (pdf 63)
    • ‘Digha Ghat Branch’ ; Bankipore to Digha Ghat, 1885; 5.5 miles(8.8km). Page 54 (pdf 63). A branch line of railway from the EIR station at Bankipur to the right bank of the Ganges at Digha Ghat. The EIR at Digha Ghat connected to the 'Bengal and North-Western Railway'5B&NWR) at Palaza Ghat on the opposite bank by the Digha Ghat Steam Ferry [3]
    • ‘Giridih Branch Line’ ; Madhupar to Giridih, 1871; 27 miles(43km). Page 54 (pdf 63)
    • ‘Hathras Branch Line’ ; Hathras Junction to Hathras Kilah, 1898; 5.6 miles(9km). Page 55 (pdf64)
    • ‘Ikrah Branch Line’ ; Ikrah to Barabani, 1894; Barabani to Sitarampur; total 15 miles(24km). Page 54 (pdf 63)
    • ‘Jubbulpore Branch Line’; Naini to Jubbulpore; 1867; 224 miles(360km). Page 54 (pdf 63)
    • ‘Mokameh Ghat Branch Line’ ; Tal Junction to Mokameh, 1883; 3miles(4.8km). Page 54 (pdf 63). A branch line of railway from the EIR line to Mokameh to the- right bank of the River Ganges [2].
    • ‘Naihati Branch Line’ ; Bandel to Naihati, 1887; 4.5 miles(7.2km]. Page 54 (pdf 63)
    • ‘Ondal-Sainthia Chord Line’ ; Ondal to Sainthia, 1906; 43 miles(69km). Page 54 (pdf 63)
    • ‘Ondal Loop Line’ ; Ondal -Baboissola section opened 1864, constructed by the Tarkessur Railway Company and worked by EIR, incorporated into EIR 1915 as part of the ‘Ondal Loop Line’ ; Baboissola to Toposi, 1863; Toposi via Ikrah to Rupnarainpur , 1894-5; total 32 miles(51km). Page 54 (pdf 63)
    • ‘Patna Ghat Branch’; Patna to Patna Ghat, 1862; 0.9 miles(1.4km). Page 54 (pdf 63)
    • ‘Patna-Gaya Branch Line’ ; Bankipore to Gaya(Gya) opened 1879; constructed and worked by State and named Patna & Gaya State Railway; worked by EIR from 1883 and transferred to EIR 1892; 58 miles(93km). Page 54 (pdf 63)
    • ‘Salanpur Branch Line’ ; Salanpur to Shamdi, 1894-7; 5.5 miles(8.8km). Page 54 (pdf 63)
    • ‘Shikohabad-Farukhabad Branch Line’ ; Shikohabad to Farukhabad, 1905-6; 66 miles(106km). Page 55 (pdf64)
    • ‘Tari Ghat Branch Line’; Dildarnager to Tari Ghat, opened 1880 as the Dildarnagar-Ghazipur State Railway; worked by EIR; transferred to EIR 1892 becoming the EIR ‘Tari Ghat Branch Line’; 12 miles(19km). Page 54 (pdf 63)
    • ‘Tarkessur Branch Line’; Sheoraphuli-Tarkessur section opened, 1885, constructed by the Tarkessur Railway Company and worked by EIR, incorporated into EIR 1915 becoming the ‘Tarkessur Branch Line’; 22 miles(35km). Page 54 (pdf 63)
    • ‘Toposi-Barabani Chord’ ; Toposi to Barabani, 1908 and 1915; total 6.5 miles(10.4km). Page 54 (pdf 63)
    • Toposi Colliery Branch Lines’. Branch lines of railway from Toposi to Kharabad, from Nundi to Paruria, and from Salunpur to Shamdee [2] see separate page

Branches from the First Chord EIR Line

Alphabetical order with page and pdf references from the “1918 Report on Railways” ” [1] and IOR source[2]

    • ‘Azimganj Branch Line’; opened in 1863 as the Nalhati-Azimganj Railway, a 4ft(1222mm) unique rail gauge line from Nalhati to Azimganj, constructed and worked by the Indian Branch Railway. Lline taken over by the Government 1872 and re-named Nalhati State Railway; converted to BG in 1892 and becoming the EIR ‘Azimganj Branch Line’ ; 27 miles(43km). Page 55 (pdf64) , [2].
    • ‘Mirza Chowki Branch Line’; Mirza Chowki to river side, 1909, 0.2 miles(0.3km). Page 55 (pdf64)
    • ‘Monghyr Branch Line’; Jamalpur Junction to Monghyr, 1862; 5.7 miles(9.1km)
    • ‘Rajmehal Branch Line’; Tinpahar Junction to Rajmehal, 1860; 7 miles(11km). Page 55 (pdf64)
    • ‘Sakrigali Branch Line’; Sakriali to River Ganges, 1894, 1.3 miles(2.0km). Page 55 (pdf64)
    • ‘Sultangunge Ghat Branch Line’; Sultangunge Junction to Sultangunge Ghat, 1895 1.2 miles(1.9km). Page 55 (pdf64)

Branches from the Grand Chord EIR Line

Alphabetical order with page and pdf references from the “1918 Report on Railways” ” [1] and IOR source[2]

BG Lines under Construction or Sanctioned for Construction in 1918

Alphabetical order with page and pdf references from the “1918 Report on Railways” ”

    • Dhanbad-Katrasgarh Line; Dhanbad to Katrasgarh and beyond, sanctioned 1918; 2.4 miles(3.8km). Page 56 (pdf65)
    • Toposi-Baraboni Chord Line; Toposi to Baraboni, sanctioned 1913; 3.7 miles(5.9km). Page 56 (pdf65)

BG Lines absorbed into EIR

Alphabetical order with page and pdf references from the “1918 Report on Railways” [1]

BG Lines worked by EIR at some time

BG Lines – EIR network expansion lines

References

  1. 1.0 1.1 1.2 1.3 1.4 “Administration Report on Railways 1918” pages 53-56 (pdf 62-65; Retrieved 4 Nov 2016
  2. 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 British Library IOR/L/F/8/10/985 ‘Indenture between Secretary of State and East Indian Railway Company as to Certain Branch Lines, November 1893’
  3. ‘Imperial Gazetteer of India’, v. 22, p. 90. ; Retrieved 16 Apr 2020