SIR Railway Network
See separate pages for further information
Railways amalgamated to form SIR
First Amalgamation 1872
- Great Southern of India Railway, broad gauge(BG), opened 1861. Merged with Carnatic Railway Company to form SIR ; 1872 and subsequently converted to metre gauge(MG) as part of the SIR MG network 'Madras-Tuticorin Mainline
- Carnatic Railway. Took over Indian Tramway, 1870; merged with Great Southern of India to form SIR , 1872
- Indian Tramway Co., opened 1865. Formerly Arakkonam-Conjeevaram Tramway; Failed in 1870 and taken over by Carniatic Rly merged finally SIR..
Second Alalgamation 1907
- Madras Railway, the Jalarpet-Mangalore Mainline, broad gauge(BG). Constructed, owned and worked by MR up to 31 Dec 1907, then transferred to SIR. Opened 1860-61; extended to Calicut, 1888; finally to Mangalore, 1907.Line length 417miles(671km)
- Mettupalaiyam Branch Line. Constructed, owned and worked by MR up to 31 Dec 1907, then transferred to SIR. Podanor Junction to Coimbatore and Mettupalaiyam. Opened 1873, 26 miles(41km) )
- Palghat Branch Line. Palakkad Junction(Olavakode) to Palghat. Constructed, owned and worked by MR up to 31 Dec 1907, then transferred to SIR. Opened 1888, 2.5 miles(4km)
SIR Branch Lines and extensions
- Karaikkal-Peralam Railway, opened 1898. Financed by French Govt, constructed by Great Southern of India Railway; SIR branchline which connected the French enclave of Karaikkal with the rest of British India at Peralam, absorbed into SIR.
- Pamban Branch Railway, opened 1914. SIR branchline between India and Island of Rameswaram, Ceylon
- Villupuram-Dharmavaram Railway, opened in 1893 as a SIR branchline, it was part of the state funded MG Villupuram-Guntakal Railway. T
- Villupuram-Nellore Railway, opened before 1891. State Railway, included with SIR , 1891
- Villupuram-Tiruvanamalai Railway, opened before 1891. State Railway, included with SIR , 1891
- Quilon-Trivandrum Extension Railway, first section opened 1918 completed 1931
District Board Lines worked by SIR
The following lines were worked by SIR under arrangements with District Boards
- Tanjore District Board Railway. The first District Board line, formed 1900 by raising funds to construct feeder line; worked by SIR.
- Podanur-Pollachi Railway, opened 1905. District Board owned; worked by SIR as part of Metre gauge section network.
- Tinnevelly-Tiruchendur Railway. Constructed by District Board after 1908 and worked by SIR
- Suramangalam-Salem Railway. District Board owned, opened 1917-18, worked by SIR
- Mayavaram--Tranquebar Railway. District Board owned, under construction 1926, worked by SIR
Lines worked by SIR at some time
- Pondicherry Railway, opened 1879. French enclave; railway worked by SIR
- Cuddapah-Nellore Railway, opened before 1887. Worked by SIR linking Vijayawada and Chennai, extended 1890
- Mayavaram Mutupet Railway, opened 1890. Worked by SIR , 1897
- Nilgiri Mountain Railway, opened 1899. Worked by Madras Railway Co to 1907; then worked by SIR ; line extended, 1908
- Shoranur-Cochin Railway. Privately funded, opened in 1902. Worked by SIR , 1908
- Tinnevelly-Quilon Railway.'British Section' opened 1902, worked by SIR, 50 miles from Tinnevelly to frontier of Travancore State. 'Indian State Section' opened 1903, worked by SIR, 58 miles from frontier through Travancore State to Quillon
- Tirupattur-Krishnagiri Railway opened 1905 as a famine protection line; worked by Madras Railway(MR) until 31 December 1907; then working passed to SIR
- Shoranur-Nalambur Railway, opened 1927. Worked by SIR , 1933
- Salem-Metur-Dam Railway. Link railway to SIR main line at Salem from Metur Dam; worked by SIR, 1933
- Cochin Harbour Extension Railway, opened 1938. Part of Shoranur-Cochin Railway; worked by SIR
- Vriddhachalam-Cuddalore Railway, opened c.1880. Worked by SIR , 1933