Madras and Southern Mahratta Railway: Difference between revisions

From FIBIwiki
Jump to navigation Jump to search
PEA-2292 (talk | contribs)
Full revision all checked; IRFCA deleted, Records & IOR reference added
PEA-2292 (talk | contribs)
‘Major Stations Infobox ‘ revised
 
(7 intermediate revisions by the same user not shown)
Line 1: Line 1:
{{System_Railways_Infobox
{{System_Railways_Infobox
|image=
|image= Madras and Southern Mahratta Railway Logo.png
|caption=  
|caption= Madras and Southern Mahratta Railway Logo
|timeline1date= 1908
|timeline1date= 1908
|timeline1details= Formed from 2 exisitng systems
|timeline1details= Formed from 2 existing systems
|timeline2date=  
|timeline2date=  
|timeline2details=
|timeline2details=
Line 13: Line 13:
|timeline5details=   
|timeline5details=   
|company1= 1908
|company1= 1908
|company1details= [[Madras Railway]]
|company1details= [[Madras Railway]](Broad Gauge)
|company2= 1908
|company2= 1908
|company2details= [[Southern Mahratta Railway]]
|company2details= [[Southern Mahratta Railway]](Metre Gauge)
|company3=
|company3=
|company3details=  
|company3details=  
Line 37: Line 37:
|company12details=  
|company12details=  
|headquarters= [[Madras]]
|headquarters= [[Madras]]
|workshop=  
|workshop= [[Perambur ]];  [[Dharwar]]/[[Hubli]] <br>''See'' [[M&SMR Railway Workshops]]   
|stations=  
|stations= '''[[Madras]] '''
''See also separate page'' [[Madras_Railways_%26_Stations#Madras_Stations| ''' Madras Stations''']] ''for details''
|system1date=
|system1date=
|system1details=  
|system1details=  
Line 56: Line 57:
}}
}}


The '''Madras and Southern Mahratta Railway'''(M&SMR) was formed in 1908 from the merger of the [[Madras Railway]](MR) and the [[Southern Mahratta Railway]](SMR).
The '''Madras and Southern Mahratta Railway'''(M&SMR) was formed in 1908 mainly from the merger of <ref name=Admin1918>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n89/mode/1up " Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government  Printing,  Calcutta;  pages 81 - 97]; Retrieved 9 Sept 2020</ref>:-
<ref>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n89/mode/2up " Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government  Printing,  Calcutta;  pages 81 - 97]; Retrieved 26 Jan 2016</ref>
* '[[Madras Railway]]'(MR),  broad gauge([[Rail_gauge#Broad_Gauge|BG]]) 1032 miles(1660km), [[Madras Railway – Lines owned and worked|''see separate page for details''']]
* '[[Southern Mahratta Railway]]'(SMR), metre gauge([[Rail_gauge_#Metre_Gauge|MG]]) 1687 miles(2715km), [[Southern Mahratta Railway|''see separate page for details''']].


There were Workshops at [[Perambur]] for repairs to locomotives and coaches and wagons.  In Madras there was a separate Workshop for the locomotives and another Workshop for the carriages and wagons.<ref>[https://web.archive.org/web/20131114020145/http://dustymuffin.wordpress.com/2007/09/18/grandpas-story-part-v/ "Grandpa’s Story – Part V"]. The story (in 15 Parts) of Percy Morris who worked on the MSM 1925-1955</ref>
== History ==
The former [[Madras Railway| ‘Madras Guaranteed Railway Company’ ]] contract expired on the 31 Dec 1907. The lines owned by that Company were purchased by the Secretary of State for India, and on 1 Jan 1908 the ‘[[Madras Railway]]’ (with the exception of the broad gauge [[Jalarpet-Mangalore Mainline| ‘Jalarpet-Mangalore Section’]]  which was made over to the ‘[[South Indian Railway]]’) and together with the metre gauge  sections of the  ‘[[South Indian Railway]]’ [[Villupuram-Nellore Railway |‘Katpadi-Gudur’ and ‘Pakala-Dharmavaram’ Sections]], was made over to the [[Southern Mahratta Railway |‘South Mahratta Railway Company’]] for working. The enlarged Company being styled the '''Madras and Southern Mahratta Railway Company'''<ref name=Admin1918/>
 
In addition to the lines comprised in the system, the Company, worked the  [[Birur-Shimoga Railway |‘Birur-Shimoga Section’]], the [[Mysore-Nanjangud Railway |‘Mysore-Nanjangud Section’ ]] and [[Mysore-Bangalore Railway| ‘Mysore-Bangalore Section’]], all of which were made over to the Mysore Durbar on 1 Oct 1919 <ref name=Hist1937>[https://ia801605.us.archive.org/30/items/in.ernet.dli.2015.36650/2015.36650.India-Railway-Board-History-Of-Indian-Railways-Constructed-And-In-Progress.pdf US Archive .org pdf download of ‘History Of Indian Railways, constructed and in progress’, 31 March 1937 by ‘The Government of India - Railway Department’ page 120 pdf  153]; Retrieved  10 Sept 2020</ref>.
 
The [[Government of India |GoI]] took over direct control of the M&SMR on 1 April 1944.
 
On 14 April 1951, the M&SMR, the [[South Indian Railway]](SIR) and the [[Mysore State Railway]](MSR) merged together to become '''[[Southern Railway]]''', a zone of [[Indian Railways]].


The last Europeans were recruited in 1926.<ref>[https://web.archive.org/web/20131114020233/http://dustymuffin.wordpress.com/2007/09/11/grandpas-story-part-iv/ "Grandpa’s Story – Part IV"]. The story of Percy Morris.</ref>
<big><big>'''Madras and Southern Mahratta System Railway System'''</big></big>
[[File:M&SM Railway System 1937 Map.png||right|600px|M&SMR Railway System 1937 Map]]
<br>The ‘Madras and Southern Mahratta System Railway System’ can be defined as made up of the ‘M&SMR Broad Gauge Division ‘ and the M&SMR Metre Gauge Division ‘ .  
<br>The 1937 Report <ref name=Hist1937/> gives the total line length of 3229 miles(5196km) as follows:-


==Also see==
==M&SMR Broad Gauge Division ==
*[[Madras and Southern Mahratta Railway Rifles]]
In 1937 <ref name=Hist1937/> the total line length of the broad gauge([[Rail_gauge#Broad_Gauge|BG]])
<br> ‘M&SMR System’ BG including all worked lines was 1518 miles(2442km):-
* ‘South-West Main Line’, 133 miles(214km), opened 1856-60 by MR from Madras to Jalarpe, the final 2 miles(km) into Madras Terminal was completed in 1873
** ‘Rayapuram Branch’, 2.1 miles(3.4km) , opened  1856 by MR from Veyasapaudy to Rayapuram, extended to Basin Bridge by 1907 and  from Korukkupettai to Veyasapaudy by M&SMR in 1931 giving a total of 5 miles(8km)
** [[Walajah Road-Ranipet Railway| ‘Ranipet Branch’]] , 4.2 miles(6.8km), opened 1899 by MR from Walajah Road (Arcot ) to Ranipet
** ‘Bangalore Branch’, 87 miles(140km), opened  1864 by MR from Jalarpet Junction to Bangalore Cantonment, final 3 miles to Bangalore City in 1882
* ‘North-West Main Line’, 308 miles(496km), opened 1861-71 by MR from Arkonam to Raichur
* ‘North-East Main Line’, 480 miles(772km), opened in a series of dates from 1888 through to 1907 by MR from Basin Bridge (Madras)  via Nellore and Bezwada to the Junction near Waltair. Also named the ‘[Bezwada-Madras Railway]]’
** ‘Samalkot Junction- Cocanada Port Branch’, 10 miles(16km), opened1893 by MR from Samalkot Junction to  Cocanada Port
** ‘Guntur-Tenali Branch’, 16 miles(26km), opened 1916 by M&MSR from Guntur to Tenali
** ‘Nidadavolu-Narasapur Branch’, 47 miles(76km), opened 1929 by M&MSR from Nidadavolu to Narasapur
** ‘Cocanada-Kotipalle Branch’, 27 miles(43km), opened 1929 by M&MSR from Cocanada to Kotipalle
* ‘[[Kolar Gold Fields Railway]]’, 10 miles(16km),  opened 1894, constructed by Mysore Durbar joining the [[Kolar Gold Fields]] to [[Bowringpet]], where it connected with the ‘South-West Main Line’. Worked by MR then from 1908 as part of the M&SMR System 
* ‘[[Tenali-Repalle Railway]]’, 21 miles(34km), opened 2016, constructed by M&MSR on behalf of Guntur District Board. Worked as part of the M&SMR System . Also described as the ‘[[Guntur-Repalle Railway]]


== History ==
==M&SMR Metre Gauge Division ==
In 1937 <ref name=Hist1937/> the total line length of the metre gauge([[Rail_gauge_#Metre_Gauge|MG]])-
<br> ‘M&SMR System’ MG including all worked lines was 2087 miles(3359km):-
* ‘Main Line’, 514 miles(827km),  opened 1884-90 by ‘SMR’ from Frontier ,where it connected to the ‘[[West of India Portuguese Railway]]’, to Bezweda. The ‘’Cumbum-Tadepalli Section’, 122 miles(196km) first opened 1881 as a broad gauge([[Rail_gauge#Broad_Gauge|BG]]) line by the ‘MR’ , handed over to the ‘SMR’ and converted to metre gauge([[Rail_gauge_#Metre_Gauge|MG]]) in 1887
** ‘Harihar Branch’, 81 miles(130km), opened 1886 by SMR from Hubli to Harihar
** ‘ Bijapur Branch’, 173 miles(278km), opened 1884 by SMR from Gadag to Hotgi, extended 1927 by M&SMR to Sholapur giving total 182 miles(293km)
** ‘Poona Branch’, 227 miles(365km), opened 1886-90 by SMR from Londra to Poona
** ‘Guntakal-Mysore Frontier Branch, 120 miles(193km), opened 1893-1902 by SMR from Guntakal via Hindapur to Mysore Frontier where it connected to the ‘[[Mysore State Railway]]’ worked by
** ‘Bellary-Rayadrug Branch’, 33 miles(53km), opened 1905 by SMR from Bellary to Rayadrug
** ‘Hospet-Kottur Branch’, 56 miles(90km), opened 1905-10 by SMR completed by M&SMR from Hospet via Kottur to Kanivihalli, extended 1928 by M&SMR to Swamihalli giving a total of 68 miles(109km)
** ‘Katpadi-Dharmavaram Branch’, 180 miles(290km), opened 1891-92 by SMR from Katpadi to Dharmavaram
** ‘Pakala-Gudar Branch’, 84 miles(135km), opened 1887-91 by SMR from Pakala to Gudar
** ‘Gudivada-Bhimavaram Branch’, 41 miles(68km), opened 1928 by M&SMR from Gudivada to Bhimavaram
** ‘Guntur-Macheria Branch, 80 miles(129km), opened 1930 by M&SMR from Guntur to Macheria
* ‘[[Alnavar-Dandeli  Railway|Alnavar-Dandeli  Railway]]’, 19 miles(31km), opened 1919 by M&SMR on behalf of Government Forest Department, from Alnavar to Dandeli <ref>ibid page 131 pdf 166</ref>
* ‘[[Bangalore Harihar Railway]]‘, 210 miles(338km), opened 1884-89 by SMR from Bangalore to Harihar. Originally part of the ‘M&SMR Mysore Section’ until 1919 when  the Mysore to Bangalore section was ‘made over to the Mysore Durbar and named the ‘[[Mysore-Bangalore Railway]]’ <ref>ibid page 132 pdf 167</ref>
* ‘[[Bezwada-Masulipatam Railway]]’, 52 miles(84km),  opened 1908-09 from Bezwada to Masulipatam . Owned by [[Kistna District Board]], a  feeder line; worked as part of the M&SMR System<ref>ibid page 134 pdf 169</ref>
* ‘[[Hindupur-Yesvantpur Railway]]’, 51 miles(82km), opened 1893 from Yesvantpur to Mysore Frontier.  Also known as ‘[[Hindupur (Yesvantpur-Mysore Frontier) Railway]]’ and originally named the ‘[[Bangalore Hindupur Railway]]’ . Worked by SMR then from 1908 as part of the M&SMR System <ref>ibid page 135 pdf 170</ref> and from 1938 reverte’d to the ‘[[Mysore State Railway]]’
* ‘[[Kolhapur State Railway]]’, 29 miles(47km), opened 1891 from Kolhapur to Miraj . Worked by SMR then from 1908 as part of the M&SMR System <ref>ibid page 136 pdf 171</ref>
* ‘[[Sangli State Railway]]’, 5 miles(8km), opened 1907 from Miraj Junction to Sangli. Worked by SMR then from 1908 as part of the M&SMR System  <ref>ibid page 138 pdf 173</ref>
* ‘[[West of India Portuguese Railway]]’, 51 miles(82km)  opened 1887-88 from Mormugao Harbour to the Portugese Frontier, where it connected to the  ‘M&SMR Main Line’(''see above'')  . Worked by SMR from 1902 then from 1908 as part of the M&SMR System  <ref>ibid page 139 pdf 174</ref>


Having taken the MR into state ownership and created the new system, the Government of India ([[Government of India |GoI]]) immediately passed the working of the M&SMR to a private company of the same name.
==Railways previously worked by ‘Madras Railway’ ==
* ‘[[Jalarpet-Mangalore Mainline]]’ metre gauge([[Rail_gauge_#Metre_Gauge|MG]]), opened in 1860-62 by the [[‘Madras Railway]]’ and extended 1901-04 as the ‘[[Calicut-Azikhal  Railway]]’and reached Mangalore in  1907 as the ‘[[Azikhal-Mangalore Railway]]’. The total length of the line was 417 miles(617km) and with the following two branches 446 miles(717km) , all transferred to ‘[[South Indian Railway]]’ (SIR)  on formation of the M&SMR in 1907:-
** ‘[[Palghat Branch Line]]’, opened 1868 from Palakkad Junction(Olavakode)
** ‘[[Mettupalaiyam Branch Line]]’, opened 1873 from Podanur
* ‘[[Morappur-Dharmapuri-Hosur Railway]]’, 2ft 6in/762mm narrow gauge([[Rail_gauge#Narrow_Gauge|NG]]), opened 1906 as a famine protection line , worked by MR then made over to the ‘[[South Indian Railway]]’ (SIR)  on formation of the M&SMR in 1907


The [[Government of India |GoI]] took over direct control of the M&SMR on 1 April 1944.
==Railways worked by M&SMR then later reallocated ==
* ‘[[Mysore State Railway]]’  metre gauge([[Rail_gauge_#Metre_Gauge|MG]]) , leased and worked by SMR; from 1908 by M&SMR. Then reverted to ‘[[Mysore State Railway]]’ in  1919 comprising:-
** ‘[[Mysore-Bangalore Railway]]’, constructed by Mysore State, opened 1881, leased and worked by SMR,; from 1908 by M&SMR  until 1919
** ‘[[Mysore-Nanjangud Railway]]’, opened 1891, leased and worked by SMR, from 1908 by M&SMR  until 1919
** ‘[[Birur-Shimoga Railway]]’, opened 1899. Worked by M&SMR until 1919
* ‘[[Hindupur-Yesvantpur Railway]]’,  opened 1893,originally named the ‘[[Bangalore Hindupur Railway]]’ . Worked by SMR then from 1908 as part of the M&SMR System <ref>ibid page 135 pdf 170</ref>. Ffrom 1938 reverted to ‘[[Mysore State Railway]]’
* ‘[[Bangalore Harihar Railway]]‘, opened 1884-89. Worked by SMR then from 1908 as part of the M&SMR System . From 1938 reverted to ‘[[Mysore State Railway]]’


On 14 April 1951, the M&SMR, the [[South Indian Railway]](SIR) and the [[Mysore State Railway]](MSR) merged together to become '''Southern Railway''', a zone of Indian Railways.
==M&SMR Collieries and Coal Supplies==
''See separate pages''
*  ‘[[Talcher Colliery]]’  was a M&SMR Colliery'
*  ‘[[Jarangdih Colliery]] was a  'Joint M&SMR and [[Bombay, Baroda and Central India Railway|Bombay, Baroda & Central India Railway]](BB&CIR) Colliery'


==Railways absorbed into M&SMR==
==Railway Workshops==
*[[Madras Railway]](MR). Original Guaranteed Company; Bellary Branch transferred to [[Southern Mahratta Railway]](SMR) 1886-7; Merged with SMR to form M&SMR, 1908
The former [[Madras Railway - Locomotive, Carriage and Wagon Workshops|MR Locomotive, Carriage and Wagon Workshops]] at [[Perambur]] became the M&SMR main workshops. In Madras there was a separate repair-shop for the locomotives and another for maintaining the carriages and wagons.<ref>[https://web.archive.org/web/20131114020145/http://dustymuffin.wordpress.com/2007/09/18/grandpas-story-part-v/ "Grandpa’s Story – Part V"]. The story (in 15 Parts) of Percy Morris who worked on the M&SMR 1925-1955</ref>
**[[Azikhal-Mangalore Railway]] opened 1903. Extension to MR which merged into M&SMR in 1907
** [[Calicut-Azikhal  Railway]] opened 1888. Extension to MR which merged into M&SMR in 1907
**[[Kolar Gold Fields Railway]] opened 1894. Branch railway joining Kolar Gold Fields to [[Bowringpet-Chikballapur Railway]], worked by MR 1908 becoming M&SMR
**[[Morappur-Dharmapuri-Hosur Railway]] opened 1906. MR famine protection line to Dharmapuri; extended to Hosur 1913 and renamed Morappur-Hosur Railway
** [[Tirupattur-Krishnagiri Railway]] opened 1905. MR famine protection line;  merged with SMR to form M&SMR, 1908
** [[Walajah Road-Ranipet Railway]] opened before 1899. MR branchline linking Ranipet to mainline;  became M&SMR, 1908
*[[Southern Mahratta Railway]](SMR). Original Guaranteed Company; merged with MR to form M&SMR, 1908
**[[Bellary-Kistna State Railway]] constructed before 1890; surveyed for Hindpur extension 1892-94; worked by SMR
**[[Guntakal-Mysore Frontier Railway]] opened c.1893. Worked by SMR, 1893; became M&SMR, 1908
**[[Hindupur-Yesvantpur Railway]] opened 1893. Also known as Hindupur (Yesvantpur-Mysore Frontier) Railway, worked by SMR  became M&SMR, 1908
**[[Hospet-Kottur Railway]] opened c.1905. Originally worked by SMR becoming M&SMR, 1908
**[[Kolhapur State Railway]] opened after 1888. Worked by SMR, 1891; became part of M&SMR, 1908
**[[West of India Portuguese Railway]] opened 1886-87. Worked by SMR, 1902; became M&SMR, 1908
*[[Bezwada-Madras Railway]] opened 1899, becoming as part of M&SMR  in 1907


==Railway leased to M&SMR==
For further information [[M&SMR Railway Workshops|'''M&SMR Railway Workshops''' ''see seperate page'']]
*[[Mysore State Railway]].  leased to SMR, became M&SMR in 1907; then reverted to [[Mysore State Railway]](MSR), 1919; which became nationalised 1950.


==Lines worked by M&SMR at some time==
==M&SMR Riles Regiment==
*[[Alnavar-Dandeli Railway]] opened 1818-19. Provincial State ([[Rail_gauge#Metre_Gauge|MG]]) line worked by M&SMR
See seperate page '''[[Madras and Southern Mahratta Railway Rifles]]'''
*[[Bangalore Harihar Railway]] opened 1919. Worked by M&SMR until 1919, then MSR
*[[Bezwada-Masulipatam Railway]] opened 1908. Owned by [[Kistna District Board]], a  feeder line; worked by M&SMR
*[[Birur-Shimoga Railway]] opened 1899. Worked by M&SMR until 1919, then by MSR
*[[Dhone-Kurnool State Railway]] opened 1909. Short 32 mile MG section.  Being worked by M&SMR in 1911 and 1925. No further information.
*[[Guntur-Repalle Railway]] opened 1916. Built and worked by M&SMR. The [[Tenali-Repalle Railway]] section owned by [[Guntur District Board]].
*[[Mysore-Bangalore Railway]] opened 1881. Worked by M&SMR until 1919; then by [[Mysore State Railway]](MSR)
*[[Mysore-Nanjangud Railway]] opened 1891. Worked by M&SMR until 1919; then by [[Mysore State Railway]](MSR)
*[[Sangli State Railway]] opened 1907. Worked by M&SMR, 1914


==Records==
==Records==
Line 113: Line 148:
*'''L/F/7/1513-1526'''  “Collection 266: Madras and Southern Mahratta Railway; date unspecified"  
*'''L/F/7/1513-1526'''  “Collection 266: Madras and Southern Mahratta Railway; date unspecified"  


==Personnel Records==
Unfortunately there are no Staff agreements held at the [[British Library]] in the [[India Office Records]].
Unfortunately there are no Staff agreements held at the [[British Library]] in the [[India Office Records]].
The last Europeans were recruited in 1926. Percy Morris who worked on the M&SMR 1925-1955<ref>[https://web.archive.org/web/20131114020233/http://dustymuffin.wordpress.com/2007/09/11/grandpas-story-part-iv/ "Grandpa’s Story – Part IV"]. The story  of Percy Morris.</ref>


== References ==
== References ==

Latest revision as of 15:51, 14 March 2021

Madras and Southern Mahratta Railway

Madras and Southern Mahratta Railway Logo
System timeline
1908 Formed from 2 existing systems
Constituent companies / lines
1908 Madras Railway(Broad Gauge)
1908 Southern Mahratta Railway(Metre Gauge)
Key locations
Headquarters Madras
Workshops Perambur ; Dharwar/Hubli
See M&SMR Railway Workshops
Major Stations Madras

See also separate page Madras Stations for details

Successor system / organisation
1951 Southern Railway (IR zone)
System mileage
Broad gauge 1092 miles (1943)
Metre gauge 1712 miles (1943)
Associated auxiliary force
Madras and Southern Mahratta Railway Rifles
How to interpret this infobox

The Madras and Southern Mahratta Railway(M&SMR) was formed in 1908 mainly from the merger of [1]:-

History

The former ‘Madras Guaranteed Railway Company’ contract expired on the 31 Dec 1907. The lines owned by that Company were purchased by the Secretary of State for India, and on 1 Jan 1908 the ‘Madras Railway’ (with the exception of the broad gauge ‘Jalarpet-Mangalore Section’ which was made over to the ‘South Indian Railway’) and together with the metre gauge sections of the ‘South Indian Railway‘Katpadi-Gudur’ and ‘Pakala-Dharmavaram’ Sections, was made over to the ‘South Mahratta Railway Company’ for working. The enlarged Company being styled the Madras and Southern Mahratta Railway Company[1]

In addition to the lines comprised in the system, the Company, worked the ‘Birur-Shimoga Section’, the ‘Mysore-Nanjangud Section’ and ‘Mysore-Bangalore Section’, all of which were made over to the Mysore Durbar on 1 Oct 1919 [2].

The GoI took over direct control of the M&SMR on 1 April 1944.

On 14 April 1951, the M&SMR, the South Indian Railway(SIR) and the Mysore State Railway(MSR) merged together to become Southern Railway, a zone of Indian Railways.

Madras and Southern Mahratta System Railway System

M&SMR Railway System 1937 Map
M&SMR Railway System 1937 Map


The ‘Madras and Southern Mahratta System Railway System’ can be defined as made up of the ‘M&SMR Broad Gauge Division ‘ and the M&SMR Metre Gauge Division ‘ .
The 1937 Report [2] gives the total line length of 3229 miles(5196km) as follows:-

M&SMR Broad Gauge Division

In 1937 [2] the total line length of the broad gauge(BG)
‘M&SMR System’ BG including all worked lines was 1518 miles(2442km):-

  • ‘South-West Main Line’, 133 miles(214km), opened 1856-60 by MR from Madras to Jalarpe, the final 2 miles(km) into Madras Terminal was completed in 1873
    • ‘Rayapuram Branch’, 2.1 miles(3.4km) , opened 1856 by MR from Veyasapaudy to Rayapuram, extended to Basin Bridge by 1907 and from Korukkupettai to Veyasapaudy by M&SMR in 1931 giving a total of 5 miles(8km)
    • ‘Ranipet Branch’ , 4.2 miles(6.8km), opened 1899 by MR from Walajah Road (Arcot ) to Ranipet
    • ‘Bangalore Branch’, 87 miles(140km), opened 1864 by MR from Jalarpet Junction to Bangalore Cantonment, final 3 miles to Bangalore City in 1882
  • ‘North-West Main Line’, 308 miles(496km), opened 1861-71 by MR from Arkonam to Raichur
  • ‘North-East Main Line’, 480 miles(772km), opened in a series of dates from 1888 through to 1907 by MR from Basin Bridge (Madras) via Nellore and Bezwada to the Junction near Waltair. Also named the ‘[Bezwada-Madras Railway]]’
    • ‘Samalkot Junction- Cocanada Port Branch’, 10 miles(16km), opened1893 by MR from Samalkot Junction to Cocanada Port
    • ‘Guntur-Tenali Branch’, 16 miles(26km), opened 1916 by M&MSR from Guntur to Tenali
    • ‘Nidadavolu-Narasapur Branch’, 47 miles(76km), opened 1929 by M&MSR from Nidadavolu to Narasapur
    • ‘Cocanada-Kotipalle Branch’, 27 miles(43km), opened 1929 by M&MSR from Cocanada to Kotipalle
  • Kolar Gold Fields Railway’, 10 miles(16km), opened 1894, constructed by Mysore Durbar joining the Kolar Gold Fields to Bowringpet, where it connected with the ‘South-West Main Line’. Worked by MR then from 1908 as part of the M&SMR System
  • Tenali-Repalle Railway’, 21 miles(34km), opened 2016, constructed by M&MSR on behalf of Guntur District Board. Worked as part of the M&SMR System . Also described as the ‘Guntur-Repalle Railway

M&SMR Metre Gauge Division

In 1937 [2] the total line length of the metre gauge(MG)-
‘M&SMR System’ MG including all worked lines was 2087 miles(3359km):-

  • ‘Main Line’, 514 miles(827km), opened 1884-90 by ‘SMR’ from Frontier ,where it connected to the ‘West of India Portuguese Railway’, to Bezweda. The ‘’Cumbum-Tadepalli Section’, 122 miles(196km) first opened 1881 as a broad gauge(BG) line by the ‘MR’ , handed over to the ‘SMR’ and converted to metre gauge(MG) in 1887
    • ‘Harihar Branch’, 81 miles(130km), opened 1886 by SMR from Hubli to Harihar
    • ‘ Bijapur Branch’, 173 miles(278km), opened 1884 by SMR from Gadag to Hotgi, extended 1927 by M&SMR to Sholapur giving total 182 miles(293km)
    • ‘Poona Branch’, 227 miles(365km), opened 1886-90 by SMR from Londra to Poona
    • ‘Guntakal-Mysore Frontier Branch, 120 miles(193km), opened 1893-1902 by SMR from Guntakal via Hindapur to Mysore Frontier where it connected to the ‘Mysore State Railway’ worked by
    • ‘Bellary-Rayadrug Branch’, 33 miles(53km), opened 1905 by SMR from Bellary to Rayadrug
    • ‘Hospet-Kottur Branch’, 56 miles(90km), opened 1905-10 by SMR completed by M&SMR from Hospet via Kottur to Kanivihalli, extended 1928 by M&SMR to Swamihalli giving a total of 68 miles(109km)
    • ‘Katpadi-Dharmavaram Branch’, 180 miles(290km), opened 1891-92 by SMR from Katpadi to Dharmavaram
    • ‘Pakala-Gudar Branch’, 84 miles(135km), opened 1887-91 by SMR from Pakala to Gudar
    • ‘Gudivada-Bhimavaram Branch’, 41 miles(68km), opened 1928 by M&SMR from Gudivada to Bhimavaram
    • ‘Guntur-Macheria Branch, 80 miles(129km), opened 1930 by M&SMR from Guntur to Macheria
  • Alnavar-Dandeli Railway’, 19 miles(31km), opened 1919 by M&SMR on behalf of Government Forest Department, from Alnavar to Dandeli [3]
  • Bangalore Harihar Railway‘, 210 miles(338km), opened 1884-89 by SMR from Bangalore to Harihar. Originally part of the ‘M&SMR Mysore Section’ until 1919 when the Mysore to Bangalore section was ‘made over to the Mysore Durbar and named the ‘Mysore-Bangalore Railway[4]
  • Bezwada-Masulipatam Railway’, 52 miles(84km), opened 1908-09 from Bezwada to Masulipatam . Owned by Kistna District Board, a feeder line; worked as part of the M&SMR System[5]
  • Hindupur-Yesvantpur Railway’, 51 miles(82km), opened 1893 from Yesvantpur to Mysore Frontier. Also known as ‘Hindupur (Yesvantpur-Mysore Frontier) Railway’ and originally named the ‘Bangalore Hindupur Railway’ . Worked by SMR then from 1908 as part of the M&SMR System [6] and from 1938 reverte’d to the ‘Mysore State Railway
  • Kolhapur State Railway’, 29 miles(47km), opened 1891 from Kolhapur to Miraj . Worked by SMR then from 1908 as part of the M&SMR System [7]
  • Sangli State Railway’, 5 miles(8km), opened 1907 from Miraj Junction to Sangli. Worked by SMR then from 1908 as part of the M&SMR System [8]
  • West of India Portuguese Railway’, 51 miles(82km) opened 1887-88 from Mormugao Harbour to the Portugese Frontier, where it connected to the ‘M&SMR Main Line’(see above) . Worked by SMR from 1902 then from 1908 as part of the M&SMR System [9]

Railways previously worked by ‘Madras Railway’

Railways worked by M&SMR then later reallocated

M&SMR Collieries and Coal Supplies

See separate pages

Railway Workshops

The former MR Locomotive, Carriage and Wagon Workshops at Perambur became the M&SMR main workshops. In Madras there was a separate repair-shop for the locomotives and another for maintaining the carriages and wagons.[11]

For further information M&SMR Railway Workshops see seperate page

M&SMR Riles Regiment

See seperate page Madras and Southern Mahratta Railway Rifles

Records

Refer to FIBIS Fact File #4: “Research sources for Indian Railways, 1845-1947” - available from the Fibis shop. This Fact File contains invaluable advice on 'Researching ancestors in the UK records of Indian Railways' with particular reference to the India Office Records (IOR) held at the British Library

An on-line search of the IOR records relating to this railway [12] gives many references. The most important being:-

  • L/AG/46/33 “Records of the India Office relating to the Madras and Southern Mahratta Railway Company; 1882-1930"
  • L/F/7/1513-1526 “Collection 266: Madras and Southern Mahratta Railway; date unspecified"

Personnel Records

Unfortunately there are no Staff agreements held at the British Library in the India Office Records.

The last Europeans were recruited in 1926. Percy Morris who worked on the M&SMR 1925-1955[13]

References

  1. 1.0 1.1 " Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government Printing, Calcutta; pages 81 - 97; Retrieved 9 Sept 2020
  2. 2.0 2.1 2.2 2.3 US Archive .org pdf download of ‘History Of Indian Railways, constructed and in progress’, 31 March 1937 by ‘The Government of India - Railway Department’ page 120 pdf 153; Retrieved 10 Sept 2020
  3. ibid page 131 pdf 166
  4. ibid page 132 pdf 167
  5. ibid page 134 pdf 169
  6. ibid page 135 pdf 170
  7. ibid page 136 pdf 171
  8. ibid page 138 pdf 173
  9. ibid page 139 pdf 174
  10. ibid page 135 pdf 170
  11. "Grandpa’s Story – Part V". The story (in 15 Parts) of Percy Morris who worked on the M&SMR 1925-1955
  12. “British Library Archives and Manuscripts Catalogue” - Search; Retrieved Jan 2016
  13. "Grandpa’s Story – Part IV". The story of Percy Morris.