Bengal and North-Western Railway: Difference between revisions

From FIBIwiki
Jump to navigation Jump to search
PEA-2292 (talk | contribs)
'Izat Bridge' and 'Alexander Izat' information and references added.
PEA-2292 (talk | contribs)
 
(11 intermediate revisions by the same user not shown)
Line 1: Line 1:
{{Line Railways Infobox
{{Line Railways Infobox
|image=
|image= Bengal and North Western Railway Logo b.jpg
|caption=  
|caption= Bengal and North Western Railway Logo
|route=  
|route=  
|gauge1= Metre gauge
|gauge1= Metre gauge
Line 69: Line 69:
|company12details=  
|company12details=  
|headquarters= [[Gorakhpur]]
|headquarters= [[Gorakhpur]]
|workshop= [[Gorakhpur]], [[Samastipur]] (Stores)
|workshop= [[Gorakhpur]], [[Samastipur]] (and Stores), [[Sonpur]] <br> ''See'' [[B&NWR Railway Workshops]]
|stations= [[Benares]], [[Darbhanga]], [[Ghazipur]], [[Gonda]], [[Monghyr]], [[Muzaffarpur]]
|stations= [[Benares]], [[Darbhanga]], [[Ghazipur]], [[Gonda]], [[Monghyr]], [[Muzaffarpur]]
|system1date= 1943
|system1date= 1943
Line 88: Line 88:
}}
}}


The '''Bengal and North-Western Railway''' (B&NWR) was a metre gauge([[Rail_gauge_#Metre_Gauge|MG]]) railway.
The '''Bengal and North-Western Railway''' (B&NWR) was a metre gauge([[Rail_gauge_#Metre_Gauge|MG]]) railway owned and worked by the ‘Bengal and North Western Railway Company ‘(registered 23 October 1882, dissolved October 1946).
<ref>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n165/mode/2up "Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government  Printing,  Calcutta;  page 157-162]; Retrieved 19 Feb 2016</ref>
<br> In 1890 the company took over management of the ‘[[Tirhoot State Railway]]’(TSR) and managed a number of further lines up until 1943
<br>The ‘Bengal and North Western Railway’ was merged into the ‘[[Oudh and Tirhut Railway]]’ on 1 January 1943


The Bengal and North Western Railway Company came into being in October 1882 as a result of an agreement made with the Secretary of State for India. The government had started work in 1881 on constructing a rail link between [[Patna]] and [[Bahraich]], along the Ghaghara River. The company agreed to complete the construction works and, in consideration of that investment, the government would provide a tranche of land without charge (instead of providing a guaranteed return). Once constructed the company became responsible for the railway’s operation under the concession agreement
==History==
The ‘Bengal and North Western Railway Company ‘came into being in October 1882 as a result of an agreement made with the Secretary of State for India. The government had started work in 1881 on constructing a rail link between [[Patna]] and [[Bahraich]], along the Ghaghara River. The company agreed to complete the construction works and, in consideration of that investment, the government would provide a tranche of land without charge (instead of providing a guaranteed return). Once constructed the company became responsible for the railway’s operation under the concession agreement
<ref>[https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/228649/8330.pdf Great Britain. Law Commission, “Statute Law Repeals: Nineteenth Report : Draft Statute Law (Repeals) Bill; April 2012"];  page 118, paragraph 3.14. Retrieved 19 Feb 2016</ref>
<ref>[https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/228649/8330.pdf Great Britain. Law Commission, “Statute Law Repeals: Nineteenth Report : Draft Statute Law (Repeals) Bill; April 2012"];  page 118, paragraph 3.14. Retrieved 19 Feb 2016</ref>


Line 99: Line 101:
An outstanding tribute was paid to [[Alexander Izat]] in 1912 - see the Inaugeration of the  [[Izat Bridge]]  
An outstanding tribute was paid to [[Alexander Izat]] in 1912 - see the Inaugeration of the  [[Izat Bridge]]  


No other staff records have been identified.  
In 1890 the company took over management of the ‘[[Tirhoot State Railway]]’(TSR) and managed a number of further lines up until 1943 <ref name=name>[https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/228649/8330.pdf  Great Britain. Law Commission, “Statute Law Repeals: Nineteenth Report : Draft Statute Law (Repeals) Bill; April 2012"];  page 118, paragraph 3.15. Retrieved 19 Feb 2016</ref>.


In 1890 the company took over management of the [[Tirhoot State Railway]], and managed further lines up until 1943.
Later, following retirement of [[Alexander Izat]] in 1904, [[James Rennie Izat]], the eldest son became the B&NWR Chief Engineer <ref>[http://www.gracesguide.co.uk/James_Rennie_Izat Grace's Guide "James Rennie Izat"]; Retrieved on 21 Jul 2016</ref>, and later the B&NWR Agent and General Manager, with headquarters at [[Gorakhpur]] <ref name=gazette>[https://www.thegazette.co.uk/London/issue/35951/page/1373/data.pdf "The London Gazette 23 March ]; Retrieved on 21 Jul 2016</ref>. [[William Rennie Izat]], a younger son  was the B&NWR Chief Engineer <ref>[http://www.gracesguide.co.uk/W._R._Izat Grace's Guide "W R Izat"]; Retrieved on 21 Jul 2016</ref>. ''It has not been possible to determine these dates''.  
<ref name=name>[https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/228649/8330.pdf Great Britain. Law Commission, “Statute Law Repeals: Nineteenth Report : Draft Statute Law (Repeals) Bill; April 2012"]; page 118, paragraph 3.15. Retrieved 19 Feb 2016</ref>
 
The B&NWR eventually comprising a complicated network of lines on the left (north) bank of the Ganges between [[Katihar]] in the east and [[Lucknow]] in the west.


On 1 January 1943, the Government of India nationalised the B&NWR and amalgamated it with the [[Rohilkund and Kumaon Railway]] and the [[Lucknow-Bareilly State Railway]] to form the [[Oudh and Tirhut Railway]] which subsequently, in 1952, became part of '''North Eastern Railway''', a zone of Indian Railways.
On 1 January 1943, the Government of India nationalised the B&NWR and amalgamated it with the [[Rohilkund and Kumaon Railway]] and the [[Lucknow-Bareilly State Railway]] to form the [[Oudh and Tirhut Railway]] which subsequently, in 1952, became part of '''North Eastern Railway''', a zone of Indian Railways.
<ref name=name/>
<ref name=name/>


===Bengal & North Western main line===
==B&NWR Lines Owned and Worked==
B&NWR main line was 301 miles long [[Metre gauge]] consisting of following sections:
[[File:Bengal and North-Western Railway Railway Map 1909.png|thumb|B&BNR Lines Owned and Worked , 1909]]
* Sonepur to Mankapur (219 miles) opened 15 January 1885
[[File:B&NWR Lines Owned and Worked 1937.png|thumb| B&NWR Lines Owned and Worked , 1937]]
* Mankapur to Gonda (17 miles) opened 2 April 1884
The B&NWR  system, (including the ‘[[Tirhoot State Railway]]),  eventually comprising a complicated network of lines on the left (north) bank of the Ganges between [[Katihar]] in the east and [[Lucknow]] in the west . The  northernmost of which lies along the Nepal Frontier, whereit is in close touch for a length of about 400 miles. Its southern boundary is for the most part the Ganges, and includes within its area the whole of the trans-Gogra districts with most of Bihar. The lines run through an especially fertile area of land between the Ganges and Gogra rivers known as the Doab. Doab literally means land lying between two confluent rivers. Most of the trade was born by these rivers and the railway has many spur lines to ghats on both rivers
* Gonda to Colonelganj (18 miles) opened (29 October 1891) 1 February 1892
* Colonelganj to Jarwal Road (11 miles) opened 1 February 1892
* Jarwal Road to Bahramghat (5 miles) (including [[Elgin Bridge, Barabanki|Elgin Bridge]]) opened 18 December 1896
* Bahramghat to Burhwal (4 miles) opened 24 November 1896
* Burwhal to Barabanki (Broad gauge: 17 miles) opened 1 April 1872
** Burhwal to Barabanki (Broad to Mixed gauge) converted 24 November 1896
** Burhwal to Barabanki (Mixed to Metre gauge) converted around 1943
* Chupra-Benares-Allahabad Branch (Metre Gauge) first section opened 1891, extended to Jhusi 1909, [[Izat Bridge]] 1912, [[Allahabad]] 1913 <ref>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n166/mode/1up "Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government  PrintingCalcutta;  page 158]; Retrieved  20 Jul 2016</ref>.
* Dighwara-Goldingganj diversion (7 miles) opened around 1960
* Barabanki to Chhapra (Metre to Broad gauge) converted 1981
* Chhapra Kacheri to Dighwara (Metre to Broad gauge: 10 miles) converted autumn 2006


===Lines worked by B&NWR===
To the east it is bounded by the [[Eastern Bengal Railway]](EBR); on the west by the [[Rohilkund and Kumaon Railway]](R&KR);to the south by the [[East Indian Railway]](EIR) and [[Oudh and Rohilkhand Railway]](O&RR) broad-gauge lines Also links up with the [[Rajputana-Malwa Railway]](RMR) metre-gauge system at Cawnpore.
*[[Benares City Branch Railway]], opened as branch of [[Oudh and Rohilkhand Railway]](O&RR) 1899; however worked by B&NWR
 
*[[Cawnpore-Barabanki Railway]], opened 1896; worked Jointly between B&NWR and [[Rohilkund and Kumaon Railway]]( R&KR) networks
In 1905 there was 1468 miles(2363km)  of metre gauge([[Rail_gauge_#Metre_Gauge|MG]]) in the B&NWR Network, (902 miles plus the  566 miles ‘[[Tirhoot State Railway]](TSR)’)
*[[Darbhanga State Railway]], opened 1883-84 as Nirmali Branch of [[Tirhoot State Railway]](TSR); worked by B&NWR 1886-1890; then reverted to TSR
<br>By 1918 this increased to 2046 miles(3293km); (1242 miles plus 804 miles TSR) 
*[[Nirmali Branch Railway]], alternative name for [[Darbhanga State Railway]]
<ref name=Admin1918>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n165/mode/2up "Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government  Printing,  Calcutta;  page 157-162]; Retrieved 16 Apr 2020</ref>
*[[Masharak-Thawe Extension Railway]], opened 1931, worked by B&NWR
<br>By 1937 there was 2108 miles(3392km); (1270 miles plus 740 miles TSR)
*[[Patna-Baraich Railway]], constucted by B&NWR under arrangement with Government of India([[Government of India |GoI]]); first phase opened 1884 and worked by B&NWR.  
<ref name=Admin1937>[https://ia801605.us.archive.org/30/items/in.ernet.dli.2015.36650/2015.36650.India-Railway-Board-History-Of-Indian-Railways-Constructed-And-In-Progress.pdf  US Archive .org pdf download of ‘History Of Indian Railways, constructed and in progress’, 31 March 1937 by ‘The Government of India – Railway Department’pages 11-20, pdf 32-41]; Retrieved 16 Apr 2020</ref>
*[[Sagauli-Raxaul Railway]],opened 1899, included under B&NWR, 1904
*[[Tirhoot State Railway]], opened 1874. Temporary famine relief line; worked by B&NWR 1886-1890; then independent
[[B&NWR Lines Owned and Worked|''See separate page''  '''B&NWR Lines Owned and Worked''' ''for full details of all lines''  ]]
 
== Classification ==
[[Indian Railway Classification]] of 1926 – Class 1 railway system <ref name=Admin1937/>.
 
==B&NWR Railway Workshops==
The B&NWR constructed a number of workshops over the years at [[Sonpur]], [[Gorakhpur]] and [[Samastipur]]
 
[[B&NWR Railway Workshops|''See separate page''  '''B&NWR Railway Workshops''']]
 
==B&NWR Railway Constructions==
[[File:B&NWR Bridges ABC.png|thumb|B&NWR Bridges]]
''See separate page for details''
* '''[[Inchcape Bridge]]''' marked '''A''' on map
* '''[[Izat Bridge]]''' marked '''B''' on map
* '''[[Elgin Bridge, Barabanki|Elgin Bridge]]''' marked '''C''' on map


==Records==
==Records==
Line 143: Line 146:
*'''L /F/7/256-278''' “Collection 27: Bengal and North Western Railway; 1908-1946”
*'''L /F/7/256-278''' “Collection 27: Bengal and North Western Railway; 1908-1946”


As a State Railway a search of the following may yield a result -
==Personnel Records==
*'''L/F/8/1-20''' "Appointments to State Railways made in the UK 1855-1946"
'''[[India Office Records]]'''. There are no staff lists or personnel records for the B&NWR held at the [[British Library]].
*'''Z/L/F/8/1-2''' Index to Appointments to State Railways made in the UK 1855-1946"
 
'''Miscellaneous references''' have been identified from varied sources:-
*[[James Rhind]], 1883, B&NWR Locomotive Superintendent, posted from PWD at request of [[Alexander Izat]], on taking charge of the construction of the B&NWR. He equipped the line with rolling-stock, built a number of steamers and flats for the [[Ganges Ferry, Digha Ghat-Sonpur]], near [[Bankipore]], and also for the crossing of the Gogra River, near Ajoodhia'. He died in September 1888 on duty with B&NWR <ref>[http://www.gracesguide.co.uk/James_Rhind Grace's Guide "James Rhind"] Retrieved on 23 Jul 2016</ref>. 
*[[George John Price]], 1896, B&NWR Assistant Engineer. Employed for some years on the construction of the B&NWR Mansi-Khatihar branch line in [[Kharik]] subdivision, under [[Alexander Izat]] the Chief Engineer and Agent. Transferred to [[Gonda]], in Oudh, where he was placed in charge of a B&NWR division of the railway and died in service November, 1903 <ref>[http://www.gracesguide.co.uk/George_John_Price  Grace's Guide "George John Price"] Retrieved on 23 Jul 2016</ref>.
*[[William Ernest Napper]], 1903-20 Engineer. In charge of [[Gonda]] Division on death of [[George John Price]] in Nov 1903. Remained with B&NWR until 1920  [[William Ernest Napper|''see biography'']]


==External Links==
==External Links==

Latest revision as of 09:32, 26 November 2020

Bengal and North-Western Railway

Bengal and North Western Railway Logo
Line of route
Gauge / mileage
Metre gauge 902 miles (1905)
Timeline
1881 Company formed
1884 First section opened to traffic
Key locations
Presidency Bengal
Stations Baharaich, Basti, Bhatni, Mankapur
System agency
1881 Bengal and North-Western Railway
1943 Oudh and Tirhut Railway
How to interpret this infobox
Bengal and North-Western Railway
[[Image:|150px| ]]
System timeline
Constituent companies / lines
Bengal and North-Western Railway
1890 Tirhoot State Railway
Key locations
Headquarters Gorakhpur
Workshops Gorakhpur, Samastipur (and Stores), Sonpur
See B&NWR Railway Workshops
Major Stations Benares, Darbhanga, Ghazipur, Gonda, Monghyr, Muzaffarpur
Successor system / organisation
1943 Oudh and Tirhut Railway
System mileage
Metre gauge 1468 miles (1905)
2088 miles (1943)
Associated auxiliary force
Bengal and North Western Railway Battalion
How to interpret this infobox

The Bengal and North-Western Railway (B&NWR) was a metre gauge(MG) railway owned and worked by the ‘Bengal and North Western Railway Company ‘(registered 23 October 1882, dissolved October 1946).
In 1890 the company took over management of the ‘Tirhoot State Railway’(TSR) and managed a number of further lines up until 1943
The ‘Bengal and North Western Railway’ was merged into the ‘Oudh and Tirhut Railway’ on 1 January 1943

History

The ‘Bengal and North Western Railway Company ‘came into being in October 1882 as a result of an agreement made with the Secretary of State for India. The government had started work in 1881 on constructing a rail link between Patna and Bahraich, along the Ghaghara River. The company agreed to complete the construction works and, in consideration of that investment, the government would provide a tranche of land without charge (instead of providing a guaranteed return). Once constructed the company became responsible for the railway’s operation under the concession agreement [1]

The B&NWR was unusual in that it was one of the very few railways promoted and constructed without Government assistance other than the gift of land, the original contract being signed in 1882.

The B&NWR Agent and Chief Engineer was Alexander Izat from February 1883, 'on loan' from the Public Works Department [2], a post which he held till the 31st May 1904 when he joined the Home Board as Managing Director [3]. An outstanding tribute was paid to Alexander Izat in 1912 - see the Inaugeration of the Izat Bridge

In 1890 the company took over management of the ‘Tirhoot State Railway’(TSR) and managed a number of further lines up until 1943 [4].

Later, following retirement of Alexander Izat in 1904, James Rennie Izat, the eldest son became the B&NWR Chief Engineer [5], and later the B&NWR Agent and General Manager, with headquarters at Gorakhpur [6]. William Rennie Izat, a younger son was the B&NWR Chief Engineer [7]. It has not been possible to determine these dates.

On 1 January 1943, the Government of India nationalised the B&NWR and amalgamated it with the Rohilkund and Kumaon Railway and the Lucknow-Bareilly State Railway to form the Oudh and Tirhut Railway which subsequently, in 1952, became part of North Eastern Railway, a zone of Indian Railways. [4]

B&NWR Lines Owned and Worked

B&BNR Lines Owned and Worked , 1909
B&NWR Lines Owned and Worked , 1937

The B&NWR system, (including the ‘Tirhoot State Railway’), eventually comprising a complicated network of lines on the left (north) bank of the Ganges between Katihar in the east and Lucknow in the west . The northernmost of which lies along the Nepal Frontier, whereit is in close touch for a length of about 400 miles. Its southern boundary is for the most part the Ganges, and includes within its area the whole of the trans-Gogra districts with most of Bihar. The lines run through an especially fertile area of land between the Ganges and Gogra rivers known as the Doab. Doab literally means land lying between two confluent rivers. Most of the trade was born by these rivers and the railway has many spur lines to ghats on both rivers

To the east it is bounded by the Eastern Bengal Railway(EBR); on the west by the Rohilkund and Kumaon Railway(R&KR);to the south by the East Indian Railway(EIR) and Oudh and Rohilkhand Railway(O&RR) broad-gauge lines Also links up with the Rajputana-Malwa Railway(RMR) metre-gauge system at Cawnpore.

In 1905 there was 1468 miles(2363km) of metre gauge(MG) in the B&NWR Network, (902 miles plus the 566 miles ‘Tirhoot State Railway(TSR)’)
By 1918 this increased to 2046 miles(3293km); (1242 miles plus 804 miles TSR) [8]
By 1937 there was 2108 miles(3392km); (1270 miles plus 740 miles TSR) [9]

See separate page B&NWR Lines Owned and Worked for full details of all lines

Classification

Indian Railway Classification of 1926 – Class 1 railway system [9].

B&NWR Railway Workshops

The B&NWR constructed a number of workshops over the years at Sonpur, Gorakhpur and Samastipur

See separate page B&NWR Railway Workshops

B&NWR Railway Constructions

B&NWR Bridges

See separate page for details

Records

Refer to FIBIS Fact File #4: “Research sources for Indian Railways, 1845-1947” - available from the Fibis shop. This Fact File contains invaluable advice on 'Researching ancestors in the UK records of Indian Railways' with particular reference to the India Office Records (IOR) held at the British Library

An on-line search of the IOR records relating to this railway [10] gives 81 references. The most important being:-

  • L/AG/46/23 “Records of the India Office relating to the Bengal and North Western Railway; 1882-1921”
  • L /F/7/256-278 “Collection 27: Bengal and North Western Railway; 1908-1946”

Personnel Records

India Office Records. There are no staff lists or personnel records for the B&NWR held at the British Library.

Miscellaneous references have been identified from varied sources:-

  • James Rhind, 1883, B&NWR Locomotive Superintendent, posted from PWD at request of Alexander Izat, on taking charge of the construction of the B&NWR. He equipped the line with rolling-stock, built a number of steamers and flats for the Ganges Ferry, Digha Ghat-Sonpur, near Bankipore, and also for the crossing of the Gogra River, near Ajoodhia'. He died in September 1888 on duty with B&NWR [11].
  • George John Price, 1896, B&NWR Assistant Engineer. Employed for some years on the construction of the B&NWR Mansi-Khatihar branch line in Kharik subdivision, under Alexander Izat the Chief Engineer and Agent. Transferred to Gonda, in Oudh, where he was placed in charge of a B&NWR division of the railway and died in service November, 1903 [12].
  • William Ernest Napper, 1903-20 Engineer. In charge of Gonda Division on death of George John Price in Nov 1903. Remained with B&NWR until 1920 see biography

External Links

"Bengal and North Western Railway" Wikipedia

References