Southern Mahratta Railway: Difference between revisions

From FIBIwiki
Jump to navigation Jump to search
PEA-2292 (talk | contribs)
1909 Railway Map Section added
PEA-2292 (talk | contribs)
'Birur-Shimoga Railway' text changes and other minor text corrections
Line 104: Line 104:


==Railways absorbed into/worked by SMR==
==Railways absorbed into/worked by SMR==
*[[ Birur-Shimoga Railway]]a metre gauge(MG) branch line in the Indian State of Mysore, it was worked by SMR.
*[[Birur-Shimoga Railway]] a [[Rail_gauge_#Metre_Gauge|MG]] branch line in the Indian State of Mysore, opened in 1899, 38 miles(61km). Worked by SMR and from 1908 by M&SMR until 1919. See [[Birur-Shimoga Railway]].
*[[Bellary-Kistna State Railway]] constructed before 1890; surveyed for Hindpur extension 1892-94; worked by SMR; became M&SMR, 1908
*[[Bellary-Kistna State Railway]] constructed before 1890; surveyed for Hindpur extension 1892-94; worked by SMR and from 1908 by M&SMR; became M&SMR, 1908
*[[Guntakal-Mysore Frontier Railway]] opened c.1893. Worked by SMR, 1893; became M&SMR, 1908
*[[Guntakal-Mysore Frontier Railway]] opened c.1893. Worked by SMR, 1893 and from 1908 by M&SMR
*[[Hindupur-Yesvantpur Railway]] opened 1893. Also known as Hindupur (Yesvantpur)-Mysore Frontier Railway, worked by SMR  became M&SMR, 1908
*[[Hindupur-Yesvantpur Railway]] opened 1893. Also known as Hindupur (Yesvantpur)-Mysore Frontier Railway, worked by SMR  became M&SMR, 1908
*[[Hospet-Kottur Railway]] opened c.1905. Originally worked by SMR becoming M&SMR, 1908
*[[Hospet-Kottur Railway]] opened c.1905. Originally worked by SMR and from 1908 by M&SMR
*[[Kolhapur State Railway]] opened after 1888. Worked by SMR, 1891; became part of M&SMR, 1908
*[[Kolhapur State Railway]] opened after 1888. Worked by SMR, 1891; and from 1908 by M&SMR
*[[West of India Portuguese Railway]] opened 1886-87. Worked by SMR, 1902; became M&SMR, 1908
*[[West of India Portuguese Railway]] opened 1886-87. Worked by SMR, 1902nd from 1908 by M&SMR  
*[[Sangli State Railway]] opened in 1907 as a short  5 mile(8km) link from SMR Miraj Junction to Sangli, Worked by SMR, 1907; became M&SMR, 1908.
*[[Sangli State Railway]] opened in 1907 as a short  5 mile(8km) link from SMR Miraj Junction to Sangli, Worked by SMR, 1907 and from 1908 by M&SMR


==Records==
==Records==

Revision as of 15:32, 17 December 2016

Southern Mahratta Railway
[[Image:|150px| ]]
Line of route
Hotgi to Guntakal
Guntakal to Bezwada
Gadag to Poona
Bellary to Rayadrug (branch)
Gauge / mileage
Metre gauge 1042 miles (1905)
Timeline
1884 First sections opened to traffic
Key locations
Presidency Madras, Bombay
Stations Bagalkot, Belgaum, Bellary, Bezwada, Bijapur, Cumbum, Gadag, Guntakal, Guntur, Harihar, Hospet, Hotgi, Londa, Miraj, Nandyal, Poona, Rayadrug, Tadepalli
System agency
1882 Worked by Southern Mahratta Railway
1907 Madras and Southern Mahratta Railway
How to interpret this infobox
Southern Mahratta Railway
[[Image:|150px| ]]
System timeline
1882 Contracted to work Mysore State Railway
1907 Merged with Madras Railway
Constituent companies / lines
1882 Southern Mahratta Railway
1899-1919 Birur-Shimoga Railway
Guntakal-Mysore Frontier Railway
1887-1938 Hindupur-Yesvantpur Railway
Hospet-Kottur Railway
Kolhapur State Railway
1891-1919 Mysore-Nanjangud Railway
1887-1938 Mysore State Railway
1902 West of India Portuguese Railway
Key locations
Headquarters Dharwar
Workshops Hubli
Major Stations Bangalore, Bellary, Gadag, Guntakal, Hotgi, Kolhapur, Marmagao, Mysore, Poona
Successor system / organisation
1907 Madras and Southern Mahratta Railway
System mileage
Metre gauge 1687 miles (1905)
Associated auxiliary force
Southern Mahratta Railway Rifle Corps
How to interpret this infobox
Southern Mahratta Railway Map 1909, north section
Southern Mahratta Railway Map 1909, south section

The Southern Mahratta Railway(SMR) was also variously called the Southern Maratha Railway and the Southern Maharastra Railway.

History

In 1881 the Bombay Eastern Deccan Railway was under construction with William Michell the Engineer-in-Charge. This line immediately upon opening became the Bijapur Branch of the Southern Mahratta Railway. [1]

The Southern Mahratta Railway (SMR) was founded in 1882 to construct a metre gauge(MG) railway between Hotgi and Gadag (opened to traffic in 1884), one of the "famine lines" set up with a guarantee. In the same year (1882), it was contracted by the Indian State of Mysore to work the several metre gauge lines that the Mysore State had built or was in the course of construction.

In 1888, a line was extended from Londa towards the Portuguese colony of Goa where it connected with the Marmagao line at Castle Rock. (From 1902 this line was leased as the West of India Portuguese Railway.) By 1890, this line extended from Londa eastwards via Guntakal to Bezwada, and northwards to Poona, turning the SMR from an assortment of branches to a real railway network.

In 1908, the SMR merged with the Madras Railway(MR) to form the Madras and Southern Mahratta Railway(M&SMR)

Railways absorbed into/worked by SMR

Records

An on-line search of the India Office Records (IOR) records held at the British Library relating to this railway [2] gives several entries, the most relevant as follows: -

  • L/F/8/12/901; “Southern Mahratta Railway Company Limited, Contract as to construction, maintenance, management and working by the Southern Mahratta RailwayCompany Limited of a railway intended to be called the Southern Mahratta Railway “1 Jun 1882”
  • L/F/8/13/916 ; “Southern Mahratta Railway Company Limited, West Deccan Contract”; 28 Oct 1885
  • L/F/8/16/1178; “Southern Mahratta Railway Company Limited, Contract”; 26 Jun 1907

Personnel

Unfortunately, there are no SMR Staff agreements held at the British Library in the India Office Records.

The following personnel , from the Public Works Department, are recorded as being ‘on loan’ to the Southern Mahratta Railway Company:-

  • Frederick Lewis Dibblee , Engineer-in-Chief, 1882 , on loan for a few months on start up of SMR [3].
  • Bernard William Cantopher, 1888-89, Executive Engineer [4]
  • Theophilus Michell, 1888-89, Executive Engineer [5].
  • Henry Wilkins Clift, -1889, Executive Engineer [6].

References

Further Information

See Madras and Southern Mahratta Railway for period after 1908