Bombay, Baroda and Central India Railway

From FIBIwiki
Revision as of 05:43, 26 July 2016 by PEA-2292 (talk | contribs) (→‎Personnel Records: 'E Sydney Luard' added with references)
Jump to navigation Jump to search
Bombay, Baroda and Central India Railway

Churchgate Terminus & Offices, BBCIR, Bombay
Line of route
Bombay to Viramgam
Gauge / mileage
Broad gauge 504 miles (1905)
Timeline
1855 Formed as Guaranteed company
1905 Line acquired by State
Key locations
Presidency Bombay
Stations Ahmedabad, Baroda, Broach, Surat
System agency
1906 Worked by reformed BBCIR
How to interpret this infobox
Bombay, Baroda and Central India Railway

Bombay, Baroda & Central India Railway device
System timeline
1906 BBCIR contracted to work State line
1942 Working of system taken over by State
Constituent companies / lines
Ahmedabad-Dholka Railway
Ahmedabad-Parantij Railway
Gaekwar's Dabhoi Railway
Gaekwar's Mehsana Railway
Godhra-Rutlam-Nagda Railway
Nagda-Ujjain Railway
Palanpur-Deesa Railway
Petlad-Cambay Railway
Rajpipla Railway
Rajputana-Malwa Railway
Tapti Valley Railway
Vijapur-Kalol-Kadi Railway
Key locations
Headquarters Bombay (BG), Ajmer (MG)
Workshops Parel (BG), Ajmer (MG)
Major Stations Agra, Ajmer, Ahmedabad, Baroda, Cawnpore, Delhi, Indore, Jaipur, Rutlam, Surat
Successor system / organisation
1951 Western Railway (IR zone)
System mileage
Broad gauge 868 miles (1905)
1233 miles (1943)
Metre gauge 2022 miles (1905)
1985 miles (1943)
2'6" NG 132 miles (1905)
152 miles (1943)
Associated auxiliary force
Bombay, Baroda and Central India Railway Regiment
How to interpret this infobox

The Bombay, Baroda and Central India Railway Company (BB&CIR) was incorporated in 1855 for "the construction and working of a line from Bombay, via Surat and Baroda, to Ahmedabad - total about 320 miles. Capital 2,300,000l. Rate of Interest Guaranteed - 5 per cent on 2,000,000l. capital and 4½ per cent . on 300,000l. debentures." [1]

History

In 1852 John Pitt Kennedy was introduced in London to Lieutenant-Colonel French, who had been Acting Resident at the Court of the Guicowar of Baroda. Colonel French wanted to get up a company to construct a line of railway from Baroda to Tankaria Bunda, in the gulf of Cambay, a distance of about 45 miles. Colonel Kennedy joined him, but instead of the original line proposed, they projected what became the Bombay, Baroda, and Central India railway [2].

Their object was to open the most effectual line from Bombay, through the central and north-western districts, to meet the railway in progress of construction from Calcutta to Delhi, together with all the branches that such a line could require. Upon the formation of the company, Colonel Kennedy was appointed consulting engineer and managing director. A staff of engineers was sent to Bombay, and during the cold season of 1853, comparative surveys, sufficient to lay a well-digested scheme before the Government, were made [2].

On the 3rd of November, 1854, the Governor-General, Lord Dalhousie, sanctioned Broach, and Baroda, to Ahmedabad, leaving the remainder of the scheme for future decision, and the work to be commenced at Bombay. The Home Government, however, decided that the work should be commenced at Surat [2].

Construction commenced in 1855 and began work on track from Baroda to Surat. By 1865, the Bombay-Surat-Baroda-Ahmedabad route was complete; in 1867, the Virar -Bombay Backbay suburban service commenced with one train in each direction each day. In 1871, trackage was 300 miles (480km).

On 31 December 1905, ownership of the BB&CIR passed to the Government of India GoI and a new company formed to manage the BB&CIR under a contract agreed in 1907 and revised in 1913. [3] [4]

Management of the BB&CIR passed to the GoI on 1 January 1942.

In 1951, the BB&CIR (less the Delhi-Rewari-Fazilka and Kanpur-Achnera sections) merged with the Saurashtra, Jaipur State, Jodhpur (Marwar-Phulad section), Rajasthan and Cutch State railways to become the Western Railway, a zone of Indian Railways.

Branch Lines and extensions

Railways absorbed into BB&CIR

Lines worked by BB&CIR at some time

Records

Refer to FIBIS Fact File #4: “Research sources for Indian Railways, 1845-1947” - available from the Fibis shop. This Fact File contains invaluable advice on 'Researching ancestors in the UK records of Indian Railways' with particular reference to the India Office Records (IOR) held at the British Library

An on-line search of the IOR records relating to this railway [5] gives a large number of references. The most important being:-

  • L /AG/46/6 “Records of the Bombay, Baroda and Central India Railway Company; 1856-1947”

Personnel Records

Unfortunately, there are no BB&CIR staff records held in the India Office Records at the British Library.

The only records that have been found :-

  • E Sydney Luard was the Chief Locomotive, Carriage and Wagon Superintendent for BB&CIR, Bombay Control of Locomotive and Carriage Department, BB○ redesigned and rebuilt those workshops; redesigned the rolling stock [6]. In 1892 represented BB&CIR at the Indian Railway Conference Association, Lahore. 'Locomotive Superintendents Conference' [7].
  • James Robert Tickell was posted from State Railways to BB&CIR , from 1885 on loan as Assistant Engineer; Executive Engineer, 1893 and still in post 1905 [8].
  • Frederick James Page,1909, BB&CIR, Assistant Locomotive Superintendent. He held various responsible positions with BB&CIR for nearly twenty-five years, and was concerned with the electrification of the Bombay suburban lines [9].

Stations

Bombay

  • Grant Road
  • Marine Lines
  • Church Gate
  • Kolaba

Historical books online

Bombay Baroda Central India Railway Company 1921 Pdf download, Digital Library of India

References