Indus Valley State Railway: Difference between revisions

From FIBIwiki
Jump to navigation Jump to search
PEA-2292 (talk | contribs)
'Personnel Records' complete re-write in Chrono order , some added, all referenced
PEA-2292 (talk | contribs)
m text changes to aid clarity
Line 1: Line 1:
The '''Indus Valley State Railway''' was formed between 1870 and 1871 to replace the [[Indus Flotilla]] by providing a rail link between [[Kotri]] and [[Multan]].
The '''Indus Valley State Railway'''(IVSR) was formed between 1870 and 1871 to replace the [[Indus Flotilla]] by providing a rail link between [[Kotri]] and [[Multan]].
<ref>[http://odysseuslahori.blogspot.com/2013/03/alas-sindh-is-now-lost-indus-valley.html "Alas, Sindh is now Lost: Indus Valley State Railway" by Salman Rashid March 29, 2013]; Retrieved 11 Dec 2015</ref>
<ref>[http://odysseuslahori.blogspot.com/2013/03/alas-sindh-is-now-lost-indus-valley.html "Alas, Sindh is now Lost: Indus Valley State Railway" by Salman Rashid March 29, 2013]; Retrieved 11 Dec 2015</ref>
<ref>[http://www.panhwar.com/Adobe/Administration%20report%20on%20the%20construction%20of%20the%20railway.pdf Administration report on the construction of the (Indus State) Railway, pdf format]; Retrieved 11 Dec 2015</ref>.
<ref>[http://www.panhwar.com/Adobe/Administration%20report%20on%20the%20construction%20of%20the%20railway.pdf Administration report on the construction of the (Indus State) Railway, pdf format]; Retrieved 11 Dec 2015</ref>.
Line 5: Line 5:
The survey of the line in 1869-70 was undertaken by [[John Brunton]], the Chief Resident Engineer of [[Scinde Railway]], assisted by his son [[William Arthur Brunton]].  
The survey of the line in 1869-70 was undertaken by [[John Brunton]], the Chief Resident Engineer of [[Scinde Railway]], assisted by his son [[William Arthur Brunton]].  


The  '''[[Empress Bridge]]'''originally  known as the  '''Sutlej Bridge''', near Bahawalpur, Punjab (now in Pakistan). The bridge, which opened in 1878, carried the [[Indus Valley State Railway]] over the Sutlej river between [[Ferozepur]] (Firozpur) (south of [[Lahore]]) and [[Kazur]]. The Engineer-in-Charge of the construction was [[William St. John Galwey]], assisted in 1873 by [[Hugh Lewin Monk]] from the [[Public Works Department]](PWD) Railway Branch of PWD.
The  [[Empress Bridge]],  opened in 1878, carried the IVSR over the Sutlej river between [[Ferozepur]] (Firozpur) (south of [[Lahore]]) and [[Kazur]].


The Indus Valley State Railway had reached [[Sukkur]] in 1879 and the steam ferry that transported eight wagons at a time across the Indus between [[Rohri]] and [[Sukkur]] was found to be cumbersome and time-consuming.  The opening of the [[Lansdowne Bridge]] in 1889 solved this bottleneck and thus port of [[Karachi]] was connected to the railway network.
The IVSR had reached [[Sukkur]] in 1879 and the steam ferry that transported eight wagons at a time across the Indus between [[Rohri]] and [[Sukkur]] was found to be cumbersome and time-consuming.  The opening of the [[Lansdowne Bridge]] in 1889 solved this bottleneck and thus port of [[Karachi]] was connected to the railway network.


With others, the Indus Valley State Railway was merged with the [[Sind, Punjab and Delhi Railway]] in 1886 to form the ''North-Western State Railway'' (later the [[North Western Railway]]).
With others, the Indus Valley State Railway was merged with the [[Sind, Punjab and Delhi Railway]] in 1886 to form the ''North-Western State Railway'' (later the [[North Western Railway]]).
Line 23: Line 23:


However the following have been identified from other sources:-
However the following have been identified from other sources:-
*[[Frederick Ewart Robertson]], 1869-70, deployed from[[Public Works Department]] [[:Category:State Railways|State Railways]] Department; 1869-89. 1869, employed on the IVSR survey; 1870, Engineer-in-Charge of the construction division in Upper Sind until the IVSR was opened for traffic in 1877; 1879, In-charge of a sub-division of the IVSR. He established the railway ferry over the Indus at Sukkur. The ferry was successfully worked until it was replaced by the [[Lansdowne Bridge]]; 1887, [[Lansdowne Bridge]], of the cantilever type, with a 820 feet(248M) span, involved his design of novel and suitable plant for its erection. The whole of the work was successfully carried out by him, and the bridge was opened in 1889; 1889,  appointed Engineer-in-Chief of the IVSR, which included the Khojak Junction under construction; 1889, resigned and became Chief Engineer [[East Indian Railway]] <ref>[http://www.gracesguide.co.uk/Frederick_Ewart_Robertson Grace's Guide "Frederick Ewart Robertson"]; Retrieved 8 Jun 2016</ref>.  
*[[Frederick Ewart Robertson]], 1869-70, deployed from[[Public Works Department]] [[:Category:State Railways|State Railways]] Department; 1869-89. 1869, employed on the IVSR survey; 1870, Engineer-in-Charge of the construction division in Upper Sind until the IVSR was opened for traffic in 1877; 1879, In-charge of a sub-division of the IVSR. He established the railway ferry over the Indus at Sukkur. The ferry was successfully worked until it was replaced by the [[Lansdowne Bridge]]; 1887, [[Lansdowne Bridge]], of the cantilever type, with a 820 feet(248M) span, involved his design of novel and suitable plant for its erection. The whole of the work was successfully carried out by him, and the bridge was opened in 1889; 1889,  appointed Engineer-in-Chief of the IVSR, which included the Khojak Junction under construction; 1889, resigned and became Chief Engineer [[East Indian Railway]] <ref>[http://www.gracesguide.co.uk/Frederick_Ewart_Robertson Grace's Guide "Frederick Ewart Robertson"]; Retrieved 8 Jun 2016</ref>.  
*[[Hugh Lewin Monk]], 1869-79. 1869 as an Assistant Engineer. Then 1874-79 as Executive Engineer assisting in the construction of the [[Empress Bridge]] <ref>[https://play.google.com/books/reader?id=b2NPAAAAMAAJ&printsec=frontcover&output=reader&hl=en_GB&pg=GBS.PA569 Google Books "India List and India Office List, 1905" page 569 (pdf page 532)] Retrieved on 19 Aug 2016</ref>  
*[[Hugh Lewin Monk]], 1869-79. 1869 as an Assistant Engineer. Then 1874-79 as Executive Engineer assisting in the construction of the [[Empress Bridge]] <ref>[https://play.google.com/books/reader?id=b2NPAAAAMAAJ&printsec=frontcover&output=reader&hl=en_GB&pg=GBS.PA569 Google Books "India List and India Office List, 1905" page 569 (pdf page 532)] Retrieved on 19 Aug 2016</ref>  
*[[Joseph Bonus]], 1870-77, Executive Engineer, Engineer-in-Chief and then Superintending Engineer IVSR <ref >[https://books.google.co.uk/books?id=b2NPAAAAMAAJ&pg=PA444=&dq Google Books "India List and India Office List -1905" page 444]; Retrieved on 19 Aug 2016</ref>.
*[[Joseph Bonus]], 1870-77, Executive Engineer, Engineer-in-Chief and then Superintending Engineer IVSR <ref >[https://books.google.co.uk/books?id=b2NPAAAAMAAJ&pg=PA444=&dq Google Books "India List and India Office List -1905" page 444]; Retrieved on 19 Aug 2016</ref>.
*[[James Arthur Anderson]], c.1871-c.1890 dates unspecified. Executive Engineer deployed from PWD to IVSR <ref> [https://play.google.com/books/reader?id=b2NPAAAAMAAJ&printsec=frontcover&output=reader&hl=en_GB&pg=GBS.PA427 Google Books "India List and India Office List, 1905" page 427 (pdf page 390 )] Retrieved on 19 Aug 2016</ref>
*[[James Arthur Anderson]], c.1871-c.1890 dates unspecified. Executive Engineer deployed from PWD to IVSR <ref> [https://play.google.com/books/reader?id=b2NPAAAAMAAJ&printsec=frontcover&output=reader&hl=en_GB&pg=GBS.PA427 Google Books "India List and India Office List, 1905" page 427 (pdf page 390 )] Retrieved on 19 Aug 2016</ref>
*[[William St. John Galwey]] , c.1872-78, Engineer-in-Chief for the construction of the [[Empress Bridge]],  opened in 1878, deployed from the [[Public Works Department]](PWD) Railway Branch.
*C. Campbell , 1872, Engineer-in-Chief, Multan Division <ref name=IVSR1872>[http://www.gracesguide.co.uk/1872_Thackers:_Indus_Valley_Railway "1872 Thacker's  Indus Valley Railway Personnel"] Retrieved on 19 Aug 2016</ref>.
*C. Campbell , 1872, Engineer-in-Chief, Multan Division <ref name=IVSR1872>[http://www.gracesguide.co.uk/1872_Thackers:_Indus_Valley_Railway "1872 Thacker's  Indus Valley Railway Personnel"] Retrieved on 19 Aug 2016</ref>.
*J. Collet , 1872, Superintending Engineer, Multan Division <ref name=IVSR1872/>.
*J. Collet , 1872, Superintending Engineer, Multan Division <ref name=IVSR1872/>.

Revision as of 05:17, 21 August 2016

The Indus Valley State Railway(IVSR) was formed between 1870 and 1871 to replace the Indus Flotilla by providing a rail link between Kotri and Multan. [1] [2].

The survey of the line in 1869-70 was undertaken by John Brunton, the Chief Resident Engineer of Scinde Railway, assisted by his son William Arthur Brunton.

The Empress Bridge, opened in 1878, carried the IVSR over the Sutlej river between Ferozepur (Firozpur) (south of Lahore) and Kazur.

The IVSR had reached Sukkur in 1879 and the steam ferry that transported eight wagons at a time across the Indus between Rohri and Sukkur was found to be cumbersome and time-consuming. The opening of the Lansdowne Bridge in 1889 solved this bottleneck and thus port of Karachi was connected to the railway network.

With others, the Indus Valley State Railway was merged with the Sind, Punjab and Delhi Railway in 1886 to form the North-Western State Railway (later the North Western Railway).

Records

Refer to FIBIS Fact File #4: “Research sources for Indian Railways, 1845-1947” - available from the Fibis shop. This Fact File contains invaluable advice on 'Researching ancestors in the UK records of Indian Railways' with particular reference to the India Office Records (IOR) held at the British Library

An on-line search of the IOR records relating to this railway [3]> gives 10 references. The most important being:-

  • V/24/3590; "Public Works Department: Railways" which contains " Administration report on the construction of the Indus Valley State Railway, 1878/79"
  • L/AG/46/34; “Records of the India Office relating to the North Western State Railway". The following appears on this IOR record:- 'The North Western State Railway was created in 1886 by the amalgamation of the Scinde-Punjab-Delhi Railway, the Indus Valley State Railway and the Punjab Northern State Railway’

Personnel Records in chronological order

Unfortunately, there are no Indus Valley State Railway (IVSR) Staff agreements held at the British Library in the India Office Records(IOR).

However the following have been identified from other sources:-

  • Frederick Ewart Robertson, 1869-70, deployed fromPublic Works Department State Railways Department; 1869-89. 1869, employed on the IVSR survey; 1870, Engineer-in-Charge of the construction division in Upper Sind until the IVSR was opened for traffic in 1877; 1879, In-charge of a sub-division of the IVSR. He established the railway ferry over the Indus at Sukkur. The ferry was successfully worked until it was replaced by the Lansdowne Bridge; 1887, Lansdowne Bridge, of the cantilever type, with a 820 feet(248M) span, involved his design of novel and suitable plant for its erection. The whole of the work was successfully carried out by him, and the bridge was opened in 1889; 1889, appointed Engineer-in-Chief of the IVSR, which included the Khojak Junction under construction; 1889, resigned and became Chief Engineer East Indian Railway [4].
  • Hugh Lewin Monk, 1869-79. 1869 as an Assistant Engineer. Then 1874-79 as Executive Engineer assisting in the construction of the Empress Bridge [5]
  • Joseph Bonus, 1870-77, Executive Engineer, Engineer-in-Chief and then Superintending Engineer IVSR [6].
  • James Arthur Anderson, c.1871-c.1890 dates unspecified. Executive Engineer deployed from PWD to IVSR [7]
  • William St. John Galwey , c.1872-78, Engineer-in-Chief for the construction of the Empress Bridge, opened in 1878, deployed from the Public Works Department(PWD) Railway Branch.
  • C. Campbell , 1872, Engineer-in-Chief, Multan Division [8].
  • J. Collet , 1872, Superintending Engineer, Multan Division [8].
  • R. Heenan, 1872, Executive Engineer, Multan Division [8].
  • W. Scott, 1872, Executive Engineer, Multan Division (Soojabad) [8].
  • F. M. Avern, 1872, Executive Engineer, Multan Division (Satlaj Bridge) [8].
  • H. C. Graham , 1872, Executive Engineer, Multan Division (Bhawalpur) [8].
  • W. Nethersole, 1872, Superintending Engineer, Rohree (Sakkhar) Division [8].
  • T. T. Ryan, 1872, Executive Engineer (Khanpur), Rohree (Sakkhar) Division [8].
  • C. E. Pridden Lieut., 1872, Executive Engineer, Rohree (Sakkhar) Division (Upper Scind) [8].
  • Archibald Cuthbert Bigg-Wither 1872-96?, deployed from Railway Branch to IVSR, dates unspecified ‘Served chiefly on the Indus Valley State Railway' [9].
  • William St. John Galwey, 1873 Engineer-in-charge of the Empress Bridge construction over the River Sutlej.
  • Frederick Lewis Dibblee, 1874-78 Superintending Engineer [10][11].
  • Frederick Nicholas Gutersloh, 1874-78, deployed from PWD - Railway Branch as Assistant Engineer [12].
  • George Winmill, 1875-88 deployed from Public Works Department(PWD) on joining as 2nd sub-Engineer [13].
  • Middleton Rayne, 1876-79, Engineer-in-chief. See British Library India Office Records IOR Mss Eur D904; "Middleton Rayne papers" with the catalogue contents 'Papers of Middleton Rayne (1830-82), Public Works Dept, Government of India 1868-79, Engineer in Chief, Indus Valley State Railway 1876-79, comprising diaries, sketchbooks, letters and photographs; also two diaries, dated 1871 and 1883, of his wife Annie.
  • James Condor, 1878-81, Traffic Superintenent IVSR [14].
  • Henry Thomas Geoghegan, 1877-79, Superintending Engineer IVSR [15].
  • Henry Francis Storey, 1879-86. 1879 as Engineer, 1881 as Engineer-in-Chief and promoted to Superintendent of Way and Works until transferred in 1886 [16]
  • Robert Trefusis Mallet, 1879-80, Engineer-in-Chief IVSR; and 1885-86 Engineer-in-Chief of IVSR Empress Bridge, 1885-86 [17].
  • William Michell, 1883-87, Executive Engineer IVSR where he held charge from time to time of the Jacobabad, Kandahar and Northern divisions [18].
  • James Ramsay, 1880-? Engineer-in-Chief IVSR [19].

Further Information

See North Western Railway from 1886 onwars.

References

  1. "Alas, Sindh is now Lost: Indus Valley State Railway" by Salman Rashid March 29, 2013; Retrieved 11 Dec 2015
  2. Administration report on the construction of the (Indus State) Railway, pdf format; Retrieved 11 Dec 2015
  3. “British Library Archives and Manuscripts Catalogue” - Search; Retrieved 23 Jan 2016
  4. Grace's Guide "Frederick Ewart Robertson"; Retrieved 8 Jun 2016
  5. Google Books "India List and India Office List, 1905" page 569 (pdf page 532) Retrieved on 19 Aug 2016
  6. Google Books "India List and India Office List -1905" page 444; Retrieved on 19 Aug 2016
  7. Google Books "India List and India Office List, 1905" page 427 (pdf page 390 ) Retrieved on 19 Aug 2016
  8. 8.0 8.1 8.2 8.3 8.4 8.5 8.6 8.7 8.8 "1872 Thacker's Indus Valley Railway Personnel" Retrieved on 19 Aug 2016
  9. Google Books "India List and India Office List -1905" page 440; Retrieved on195 Aug 2016
  10. "Minutes of the Proceedings of the Institution of Civil Engineers"; vol 97 page 398-399 year 1889 "Obituary of Frederick Lewis Dibblee"; Retrieved on 17 Apr 2016
  11. "Obituaries of Frederick Lewis Dibblee"; Retrieved on 19 Aug 2016
  12. Google Books "India List and India Office List -1905" page 510; Retrieved on 19 Aug 2016
  13. Google Books "India List and India Office List -1905" page 649; Retrieved on 8 Aug 2016
  14. Google Books " India List and India Office List, 1905" page 465 (pdf page 428) Retrieved on 19 Aug 2016
  15. Google Books " India List and India Office List, 1905" page 501 (pdf page 464) Retrieved on 19 Aug 2016
  16. "Grace's Guide - Henry Francis Storey”; Retrieved on 19 Aug 2016
  17. Google Books " India List and India Office List, 1905" page 560 (pdf page 523 Retrieved on 19 Aug 2016
  18. "Grace's Guide - William Michell”; Retrieved on 19 Aug 2016
  19. Google Books " India List and India Office List, 1905" page 595 (pdf page 558) Retrieved on 19 Aug 2016