User:PEA-2292/My sandbox: Difference between revisions

From FIBIwiki
Jump to navigation Jump to search
PEA-2292 (talk | contribs)
No edit summary
PEA-2292 (talk | contribs)
No edit summary
Line 15: Line 15:
===SIR Network===
===SIR Network===
The SIR network following the amalgamations comprised two sections:-
The SIR network following the amalgamations comprised two sections:-
====Broad Gauge====
'''put this second'''
*'''[[Jalarpet-Mangalore Mainline]]''', the broad gauge([[Rail_gauge#Broad_Gauge|BG]]) Mainline and branches; from the Madras Railway - Northern Section ''(referred to above, see also [[Jalarpet-Mangalore Mainline|separate page)]]''
**[[Mettupalaiyam Branch Line]]
**[[Palghat Branch Line]]
*[[Suramangalam-Salem Railway]]. BG, District Board owned, opened 1917-18,  worked by SIR ''(also included in 'District Board Lines' below)''


====Metre Gauge====
====Metre Gauge====
*'''[[Madras-Tuticorin Mainline]]''', the  metre gauge [[Rail_gauge_#Metre_Gauge|MG]]) Mainline and Branches, developed from the ex-GISR lines, converted to MG ''(referred to above, see also [[Madras-Tuticorin Mainline|separate page)]]''
*'''[[Madras-Tuticorin Mainline]]''', the  metre gauge [[Rail_gauge_#Metre_Gauge|MG]]) Mainline and Branches, developed from the ex-GISR lines, converted to MG ''(referred to above, see also [[Madras-Tuticorin Mainline|separate page)]]''
*Madras-Chingleput-Villupuram-Mayavaram-Tanjore-Trichinopoly-Madura-Maniyachi-Tuticorin
**[[Tuticorin Branch Line]] from [[Madura]] to [[Tuticorin]]
**[[Tuticorin Branch Line]] from [[Madura]] to [[Tuticorin]]
**[[Erode Branch Line]] from [[Trichinopoly]] to [[Erode]]
**[[Arkonam Branch Line]] from [[Chingleput]] to [[Arkonam]]
**[[Arkonam Branch Line]] from [[Chingleput]] to [[Arkonam]]
**[[Pondicherry Branch (SIR)|Pondicherry Branch Line]] from [[Villupuram]] to [[Pondicherry]]
**[[Pondicherry Branch (SIR)|Pondicherry Branch Line]] from [[Villupuram]] to [[Pondicherry]]
**[[Nagore Branch Line]] from [[Tanjore]] to [[Nagore]]
**[[Nagore Branch Line]] from [[Tanjore]] to [[Nagore]]
**[[Pulliarpati Quarry Branch Line]] from [[Tanjore]]
**[[Pulliarpati Quarry Branch Line]] from [[Tanjore]]
**[[Erode Branch Line]] from [[Trichinopoly]] to [[Erode]]
**[[Tinnevelly Branch Line]] from [[Maniyachi]] to [[Tinnevelly]]
**[[Tinnevelly Branch Line]] from [[Maniyachi]] to [[Tinnevelly]]
**[[Cuddalore Wharf Branch Line]] from [[Cuddalore]]
**[[Cuddalore Wharf Branch Line]] from [[Cuddalore]]
Line 47: Line 42:
*[[Villupuram-Tiruvanamalai Railway]], opened before 1891. State Railway, included with SIR , 1891
*[[Villupuram-Tiruvanamalai Railway]], opened before 1891. State Railway, included with SIR , 1891
*[[Quilon-Trivandrum Extension Railway]], first section opened 1918 completed 1931  
*[[Quilon-Trivandrum Extension Railway]], first section opened 1918 completed 1931  
====Broad Gauge====
*'''[[Jalarpet-Mangalore Mainline]]''', the broad gauge([[Rail_gauge#Broad_Gauge|BG]]) Mainline and branches; from the Madras Railway - Northern Section ''(referred to above, see also [[Jalarpet-Mangalore Mainline|separate page)]]''
**[[Mettupalaiyam Branch Line]]
**[[Palghat Branch Line]]
*[[Suramangalam-Salem Railway]]. BG, District Board owned, opened 1917-18,  worked by SIR ''(also included in 'District Board Lines' below)''


===District Board Lines worked by SIR===
===District Board Lines worked by SIR===

Revision as of 19:28, 2 February 2018

SIR Railway Network

See separate pages for further information

Railways amalgamated to form SIR

First Amalgamation 1872

Second Amalgamation 1907'

  • Madras Railway(MR) was a broad gauge(BG) network that was constructed, owned and worked by MR up to 31 Dec 1907. On 1 Jan 1908 the 'Southern Section' was transferred to SIR. This Section from Jalarpet had opened 1860-61; extended to Calicut, 1888 and finally to Mangalore, 1907. Line length 417 miles(671km). Upon amalgamation this became the SIR 'Jalarpet-Mangalore Mainline'.
    • Mettupalaiyam Branch Line. Constructed, owned and worked by MR up to 31 Dec 1907, then transferred to SIR. Podanor Junction to Coimbatore and Mettupalaiyam. Opened 1873, 26 miles(41km) )
    • Palghat Branch Line. Palakkad Junction(Olavakode) to Palghat. Constructed, owned and worked by MR up to 31 Dec 1907, then transferred to SIR. Opened 1888, 2.5 miles(4km)

SIR Network

The SIR network following the amalgamations comprised two sections:-

Metre Gauge



SIR Branch Lines and extensions

Broad Gauge

District Board Lines worked by SIR

The following lines were worked by SIR under arrangements with District Boards

Lines worked by SIR at some time