Bombay, Baroda & Central India Railway Network - Lines owned and worked

From FIBIwiki
Revision as of 09:58, 16 June 2020 by PEA-2292 (talk | contribs) ('Bombay-Ahmadabad BB&CIR Main Line'Miles and Km’s corrected)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Bombay, Baroda & Central India Railway Network - Lines owned and worked

- a sub-section of the Bombay, Baroda and Central India Railway(BB&CIR) page

The Bombay, Baroda and Central India Railway(BB&CIR) owned and operated an extensive network of railways of mixed gauge

  • Broad gauge(BG) - 868 miles/1397km (1905); 997 miles/1604km (1918); 1233 miles/1984km (1943)
  • Metre gauge(MG) - 2022 miles/3254km (1905); 1822 miles/2931km (1918); 1985/3195km miles (1943)
  • Narrow gauge(NG) - 132 miles/212km (1905); 326 miles/523km (1918); 152 miles/245km (1943)

The BB&CIR also managed, worked and maintained a number of mixed gauge lines on behalf of other parties.


The listings below are generally based on the “Administration Report on Railways 1918” [1] with page numbers (and pdf pages) noted at the end of each entry.

In 1918 the total length of line being worked as the BB&CIR system (both owned lines and managed/worked lines) was 3823 miles(6150km) opened plus a further 254 miles(407km) under construction or sanctioned for construction. Page 12 (pdf 21)

By 1937 the BB&CIR System was 3611 miles(5811km) of all three gauges. This showed a reduction from the 1918 mileage
In 1921 the working of the ‘Gaekwar’s Mehsana Railway’ transferred from BB&CIR to Gaekwar's Baroda State Railway, a mileage of 193 miles of MG <br<In 1936 the working of the ‘Jaipur State Railway’ transferred from BB&CIR tand reverted to the Jaipur Durbar, a mileage of 179 miles of MG

The map shows the BB&CIR System in 1937 [2].

BB&CIR System 1937 Map
BB&CIR System 1937 Map

BG Lines - owned and operated by BB&CIR

1918 Total - 997 miles(1604km)

BG Lines - managed, worked and maintained by BB&CIR

1918 Total 202 miles(325km). Page 12 (pdf 21)

MG Lines - owned and operated by BB&CIR

1918 Total - 1822 miles(2931km). Page 23 (pdf 32)

MG Lines - managed, worked and maintained by BB&CIR

1908 Total 456 miles(733km)

  • Ahmedabad-Dholka Railway private Company registered 1901; MG line 33 miles(53km) opened 1903 from Saharmati to Dholka; worked as part of BB&CIR network. Pages 24-25 (pdf 33-34)
  • Ahmedabad-Parantij Railway private Company registered 1896 ; MG line 55 miles(88km) opened 1897 from Ahmedabad to Himmatnager; extended to Khul Brahma in 1911 giving total 89 miles(142km); worked as part of BB&CIR network. Pages 25-27 (pdf 34-36)
  • Gaekwar's Mehsana Railway; owned by the Princely Baroda State; MG line 21 miles(34km) opened 1887 from Mehsana to Vadnagar; progressively expanded from 1888 through to 1921 to a total of 193 miles(309km); worked as part of BB&CIR network. Pages 27-29 (pdf 36-38) and from 1921 by GBSR
  • Jaipur State Railway; owned by Jaipur Durbar; MG line 73 miles(117km) from Jaipur to Sawai Madhopu 1905-7 ; further extended from 1916 to a planned 179 miles(286km);and Jaipur to Shaikhawati, 1916; worked as part of BB&CIR network. Pages 29-30 (pdf 38-39)
  • Palanpur-Deesa Railway; jointly owned by the Palanpur Durbar and Government of India(GoI); MG line 17 miles(27km) opened 1893 from Palanpur to Docan; worked as part of BB&CIR network. Pages 31-32 (pdf 40-41)
  • Vijapur-Kalol-Kadi Railway; owned by the Princely Baroda State; MG line of 41 miles(65km) opened 1902-3 from Vijapur to Kadi and extended by a further 5 miles(8km) in 1912 with approval in 1916 for a further 21 miles(34km); worked as part of BB&CIR network. Pages 32-33 (pdf 41-42)
  • Mathura-Hathras Provincial Railway ; MG line of 29 mile(47km) line opened in 1875. It was financed by the Provincial State and local shareholders. Not listed in 1918 Administration Report.

NG 2ft 6in Lines - managed, worked and maintained by BB&CIR

1918 Total - 326 miles(523km). Page 12 (pdf 21)

NG 2ft 6in Railways, worked by BB&CIR

Not listed in 1918 Admin Report

References