User:PEA-2292/My sandbox: Difference between revisions

From FIBIwiki
Jump to navigation Jump to search
PEA-2292 (talk | contribs)
No edit summary
PEA-2292 (talk | contribs)
No edit summary
Line 18: Line 18:
'''[[Ghaziabad-Lahore Railway |Ghaziabad- Lahore Mainline]] '''
'''[[Ghaziabad-Lahore Railway |Ghaziabad- Lahore Mainline]] '''
*[[Ghaziabad-Lahore Railway|‘Ghaziabad to Lahore Section’]], 339 miles(546km), was part of the [[Scinde, Punjaub & Delhi Railway]]( SP&DR) until amalgamation into NWR in 1886,.  The line had been constructed in stages from [[Lahore]] to [[Amritsar]] in 1862 and via [[Jullunder]], [[Ludiana]], [[Ambala]], and [[Meerut]] to [[Ghaziabad]] completed by 1870.
*[[Ghaziabad-Lahore Railway|‘Ghaziabad to Lahore Section’]], 339 miles(546km), was part of the [[Scinde, Punjaub & Delhi Railway]]( SP&DR) until amalgamation into NWR in 1886,.  The line had been constructed in stages from [[Lahore]] to [[Amritsar]] in 1862 and via [[Jullunder]], [[Ludiana]], [[Ambala]], and [[Meerut]] to [[Ghaziabad]] completed by 1870.
**[[Amritsar-Pathankot  Railway| ‘Pathankot Branch Line’]], 67 miles(107km), from [[Amritsar]] via Dinanager to [[Pathankot]], opened  1884 by SP&DR, became NWR from 1886.
**[[Amritsar-Pathankot  Railway| ‘Pathankot Branch Line’]], 67 miles(107km), a branch from [[Amritsar]] via Dinanager to [[Pathankot]], opened  1884 by SP&DR, became NWR from 1886.


'''[[Lahore & Peshawar Railway|Lahore-Peshawar Mainline]] '''   
'''[[Lahore & Peshawar Railway|Lahore-Peshawar Mainline]] '''   
*[[Lahore & Peshawar Railway| ‘Lahore to Peshawar Section’]], 288 miles (463km), was the [[Punjab Northern State Railway]] until amalgamation into NWR in 1886. The first section from [[Lahore]] to [[Jhelum]], opened 1873 as metre gauge([[Rail_gauge_#Metre_Gauge|MG]]) and converted to BG, 1878; from [[Jhelum]] via [[Rawalpindi]] the onward connection to [[Peshawar]], was made in 1883 with the completion of the [[Attock Bridge]] over the river Indus.  
*[[Lahore & Peshawar Railway| ‘Lahore to Peshawar Section’]], 288 miles (463km), was the [[Punjab Northern State Railway]] until amalgamation into NWR in 1886. The first section from [[Lahore]] to [[Jhelum]], opened 1873 as metre gauge([[Rail_gauge_#Metre_Gauge|MG]]) and converted to BG, 1878; from [[Jhelum]] via [[Rawalpindi]] the onward connection to [[Peshawar]], was made in 1883 with the completion of the [[Attock Bridge]] over the river Indus.  
**‘Tawi Branch  Line’, was completed in 1890. The 26 miles(42km)  from [[Wazirabad]] to [[Sialkot]], opened 1884 by PNSR . Extended by NWR in 1890 by 9 miles(14km) to the ‘Frontier of Kashmir State’ where the [[Jammu and Kashmir Railway]]  continued the railway a further 16 miles(26km) to the ‘Left Bank of the Tawi River near [[Jammu]]’. The 25 mile(40km)section  is in some records referred to as the [[Jammu-Sialkot Railway]]. The complete line from [[Wazirabad]]  to [[Jammu]], a total of  51 miles(82km) was part of the NWR network until partition when the line was severed.  
**‘Tawi Branch  Line’, was completed in 1890. The 26 miles(42km)  from [[Wazirabad]] (a town on the [[Lahore & Peshawar Railway| ‘Lahore to Peshawar Section’]], to [[Sialkot]], opened 1884 by PNSR . Extended by NWR in 1890 by 9 miles(14km) to the ‘Frontier of Kashmir State’ where the [[Jammu and Kashmir Railway]]  continued the railway a further 16 miles(26km) to the ‘Left Bank of the Tawi River near [[Jammu]]’. The 25 mile(40km)section  is in some records referred to as the [[Jammu-Sialkot Railway]]. The complete line from [[Wazirabad]]  to [[Jammu]], a total of  51 miles(82km) was part of the NWR network until partition when the line was severed.  


'''[[Lahore-Karachi Mainline]] '''   
'''[[Lahore-Karachi Mainline]] '''   
<br>This NWR Mainline connecting Lahore to Karachi ,  756 miles(1217km) comprised:-  
<br>This NWR Mainline connecting Lahore to Karachi ,  756 miles(1217km) comprised:-  
* ‘Lahore via Raiwind to Khanewa Section’, 177 miles(285km), was the [[Punjaub Railway]] opened in 1865, merged to form  SP&DR 1870, becoming  NWR 1886.
* ‘Lahore via Raiwind to Khanewa Section’, 177 miles(285km), originally the [[Punjaub Railway]] opened in 1865, merged to form  SP&DR 1870, becoming  NWR 1886.
**‘Raiwind-Bhatinda Branch Line’, 88 miles(141km), from [[Raiwind]] via [[Kasur]] to Hussainiwala (on the northern bank of the River Sutlej), opened 1883 by SP&DR. The [[Empress Bridge]] over the river was completed 1887 by NWR to [[Ferozepore]] and extended in 1899 to [[Bhatinda]]  
**‘Raiwind-Bhatinda Branch Line’, 88 miles(141km), a branch from [[Raiwind]] via [[Kasur]] to Hussainiwala (on the northern bank of the River Sutlej), opened 1883 by SP&DR. The [[Empress Bridge]] over the river was completed 1887 by NWR to [[Ferozepore]] and extended in 1899 to [[Bhatinda]]  
* ‘Khanewal to Lodhran Section’, 56 miles(90km), opened by NWR 1909, reducing the route length by 29 mile(46km) and making the former mainline, which had opened by [[Indus Valley State Railway|IVSR]] in 1865, into the  ‘Khanewal-Lodhran (via Sher Shar) Chord Line’ (see below)  
* ‘Khanewal to Lodhran Section’, 56 miles(90km), opened by NWR 1909, reducing the route length by 29 mile(46km) and making the former mainline, which had opened by [[Indus Valley State Railway|IVSR]] in 1865, into the  ‘Khanewal-Lodhran (via Sher Shar) Chord Line’ (see below)  
**‘Khanewal-Lodhran (via Sher Shar) Chord Line’, 85 miles(136km), from Khanewal to Multan, 1865; to Muzaffarabad , 1870; to Lodhran, 1878, formerly the IVSR Mainline, became NWR 1886. Became a NWR Chord Line In 1909 with the opening of the 29 mile shorter  ‘Khanewal  to Lodhran Section’ of the ‘[[Lahore-Karachi Mainline ]]’ (see above).
**‘Khanewal-Lodhran (via Sher Shar) Chord Line’, 85 miles(136km), from Khanewal to Multan, 1865; to Muzaffarabad , 1870; to Lodhran, 1878, formerly the IVSR Mainline, became NWR 1886. Became a NWR Chord Line In 1909 with the opening of the 29 mile shorter  ‘Khanewal  to Lodhran Section’ of the ‘[[Lahore-Karachi Mainline ]]’ (see above).
*‘Lodhran to Rohri section’, 225 miles(362km), opened 1878 by [[Indus Valley State Railway]](IVSR), which became NWR 1886  
*‘Lodhran to Rohri section’, 225 miles(362km), opened 1878 by [[Indus Valley State Railway]](IVSR), which became NWR 1886  
**’Sukkur Bandar Branch Line’, 1.5 miles(2.4km), from [[Sukkur]] Main on the ‘Lahore to Karachi Mainline’ to Sukkur Bandar, opened by IVSR in 1878  
**’Sukkur Bandar Branch Line’, 1.5 miles(2.4km), a branch from [[Sukkur]] on the ‘[[Lahore-Karachi Mainline]]’ to Sukkur Bandar, opened by IVSR in 1878  
* [[Kotri-Rohri Railway|’Rohri-Kotri Section’]], 189 miles(304km), from [[Rohri]] via  [[Hyderabad]] and Rahoki Junction to [[Kotri]] was completed in 1900 with the opening of the [[Kotri Bridge]] over the river Indus. This making the former mainline  ''(see below)'', which had opened in 1886 into the ‘[[Kotri-Rohri (via Ruk) Branch Line]]’  
* [[Kotri-Rohri Railway|’Rohri-Kotri Section’]], 189 miles(304km), from [[Rohri]] via  [[Hyderabad]] and Rahoki Junction to [[Kotri]] was completed in 1900 with the opening of the [[Kotri Bridge]] over the river Indus. This making the former mainline  ''(see below)'', which had opened in 1886 into the ‘[[Kotri-Rohri (via Ruk) Branch Line]]’  
* ‘[[Rohri-Kotri (via Ruk) Branch Line]]’ from [[Sukkur]] via  Ruk Junction, Larkhana  and Sehwan  to [[Kotri]], completed in 1878. This line was formerly the mainline until the opening of the [[Kotri Bridge]] in 1900 to complete the  NWR Mainline [[Kotri-Rohri Railway|’Rohri-Kotri Section’]]  ''(see above)''
* ‘[[Rohri-Kotri (via Ruk) Branch Line]]’ from [[Sukkur]] via  Ruk Junction, Larkhana  and Sehwan  to [[Kotri]], completed in 1878. This line was formerly the mainline until the opening of the [[Kotri Bridge]] in 1900 to complete the  NWR Mainline [[Kotri-Rohri Railway|’Rohri-Kotri Section’]]  ''(see above)''
**‘Phulji Branch Line’, 3 miles(5km), from Phulji to Puranadera, opened as a branch to the [[Kotri-Rohri Railway|’Kotri-Rohri (via Ruk) Section’]] opened by SP&DR in  1882;  with short extension by NWR,  1902  
**‘Phulji Branch Line’, 3 miles(5km), from Phulji to Puranadera, opened as a branch to the ’Kotri-Rohri (via Ruk) Section’ opened by SP&DR in  1882;  with short extension by NWR,  1902  
* [[Karachi-Kotri (Indus River) Railway|’Kotri to Karach Section]]’, 108 miles(174km), was completed in 1861 by [[Scinde Railway]],  which became  SP&DR 1870 and NWR 1886
* [[Karachi-Kotri (Indus River) Railway|’Kotri to Karach Section]]’, 108 miles(174km), was completed in 1861 by [[Scinde Railway]],  which became  SP&DR 1870 and NWR 1886


'''NWR Branch Lines'''
'''NWR Branch Lines'''
*‘Wazirabad-Khanewal Branch Line’, 201 miles(320km), from [[Wazirabad]] reaching [[Lyallpur]], 1896; extended to [[Khanewal]], 1900. Surveyed under the name [[ Wazirabad-Multan Railway]], 1892; when first section opened  1896 was named the [[Wazirabad-Lyallpur State Railway]]  and became part of the NWR network.
*‘Wazirabad-Khanewal Branch Line’, 201 miles(320km), from [[Wazirabad]] reaching [[Lyallpur]], 1896; extended to [[Khanewal]], 1900. Surveyed under the name [[ Wazirabad-Multan Railway]], 1892; when first section opened  1896 was named the [[Wazirabad-Lyallpur State Railway]]  and became part of the NWR network.
*‘Jech Doab Branch Line’, 149 miles(238km), from [[Malakwal]] (on the NWR [[Sind-Sagar Railway]])  via Sarodha, opened by NWR, 1903 ; extended to Shorkot Road, 1906 to join the ‘[[Wazirabad-Khanewal Branch Line’]]
*‘Jech Doab Branch Line’, 149 miles(238km), from [[Malakwal]] (on the NWR [[Sind-Sagar Railway]])  via Sarodha, opened by NWR, 1903 ; extended to Shorkot Road, 1906 to join the ‘Wazirabad-Khanewal Branch Line’
*‘Shahdara-Sangla  Branch Line’, 55 miles( 88km), from Shahdara (6km north of Lahore on Mainline) to Sangla (an intermediate station on the ‘[[Jech Doab Branch Line]]’) , opened by NWR, 1907
*‘Shahdara-Sangla  Branch Line’, 55 miles( 88km), from Shahdara (6km north of Lahore on Mainline) to Sangla (an intermediate station on the ‘Jech Doab Branch Line’) , opened by NWR, 1907
** ‘[[Shorekot Road-Chichoki Railway |’Shorkot Road-Chichoki Mallian Branch Line’]], 136 miles(218km), from Shorkot Road (on the ‘[[Wazirabad-Khanewal Branch Line]]’ via Jaranwala to Chichoki Mallian (an intermediate stop on the ‘[[Shahdara-Sangla  Branch Line]]’) , under survey and construction 1906-10; opened by NWR, 1909-11
** ‘[[Shorekot Road-Chichoki Railway |’Shorkot Road-Chichoki Mallian Branch Line’]], 136 miles(218km), from Shorkot Road (on the ‘[[Wazirabad-Khanewal Branch Line]]’ via Jaranwala to Chichoki Mallian (an intermediate stop on the ‘Shahdara-Sangla  Branch Line’) , under survey and construction 1906-10; opened by NWR, 1909-11
*‘Hoshiarpur Branch Line’, 23 miles(37km),  from [[Jullundur City]] (on the [[Ghaziabad-Lahore Railway |Ghaziabad- Lahore Mainline]]) to [[Hoshiarpur]], opened by NWR,  1913
*‘Hoshiarpur Branch Line’, 23 miles(37km),  from [[Jullundur ]] (on the [[Ghaziabad-Lahore Railway |Ghaziabad- Lahore Mainline]]) to [[Hoshiarpur]], opened by NWR,  1913
*‘Havelian Branch Line’, 35 miles(56km) from Sarai Kala (Not identified, thought to be Taxila Junction, 15 km NW of [[Rawlpindi]] on the ‘[[Lahore-Peshawer Mainline]]) to Havelian, opened by NWR, 1913
*‘Havelian Branch Line’, 35 miles(56km) from Sarai Kala (Not identified, thought to be Taxila Junction, 15 km NW of [[Rawlpindi]] on the ‘[[Lahore-Peshawer Mainline]]) to Havelian, opened by NWR, 1913
*‘Jakhal-Hissar Branch Line’, 50 miles(80km), from Jakhal  to [[Hissar]] opened 1913 by NWR
*‘Jakhal-Hissar Branch Line’, 50 miles(80km), from Jakhal  to [[Hissar]] opened 1913 by NWR
Line 53: Line 53:
'''Sind-Sagar Mainline'''
'''Sind-Sagar Mainline'''
* ‘[[Lala Musa-Sher Shah Mainline]’, 342 miles(550km). [[Lala Musa]] to [[Malakwal]], following the east bank  of Indus River, opened 1880 by [[Sind-Sagar Railway]] as metre gauge([[Rail_gauge_#Metre_Gauge|MG]]) converted to BG 1886 on the amalgamation into NWR. The line was extended from [[Malakwal]] via Kundian and Bhaakkar and reached [[Sher Shah ]]in 1900 where it joined the ‘[[Lahore-Karachi Mainline]]’.
* ‘[[Lala Musa-Sher Shah Mainline]’, 342 miles(550km). [[Lala Musa]] to [[Malakwal]], following the east bank  of Indus River, opened 1880 by [[Sind-Sagar Railway]] as metre gauge([[Rail_gauge_#Metre_Gauge|MG]]) converted to BG 1886 on the amalgamation into NWR. The line was extended from [[Malakwal]] via Kundian and Bhaakkar and reached [[Sher Shah ]]in 1900 where it joined the ‘[[Lahore-Karachi Mainline]]’.
** ‘Golra-Basal Section Line’, 47 Miles(75km), opened 1881 from Golra (on ‘[[Lahore-Peshawar Mainline]]’) to Basal Junction (where it joined the  ‘[[Khushalgarh-Kohat-Thal Railway]]’  
** ‘Golra-Basal Section Line’, 47 Miles(75km), opened 1881 from Golra (on ‘[[Lahore & Peshawar Railway|Lahore-Peshawar Mainline]]’) to Basal Junction (where it joined the  ‘[[Khushalgarh-Kohat-Thal Railway]]’ )
** ‘Kohat Section Line’, 39 miles(63km), 7 miles(11km) from Jand to [[Khushalgarh]] opened 1881 as [[Rail_gauge#Broad_Gauge|BG]] line; the 32 miles(52km) extension to [[Kohat]] was first opened 1902 as part of the ‘[[Khushalgarh-Kohat-Thal Railway]]’  2ft 6in/762mm narrow gauge([[Rail_gauge#Narrow_Gauge|NG]]), the section as far [[Kohat]] was converted to BG, 1908.
** ‘Kohat Section Line’, 39 miles(63km), 7 miles(11km) from Jand to [[Khushalgarh]] opened 1881 as [[Rail_gauge#Broad_Gauge|BG]] line; the 32 miles(52km) extension to [[Kohat]] was first opened 1902 as part of the ‘[[Khushalgarh-Kohat-Thal Railway]]’  2ft 6in/762mm narrow gauge([[Rail_gauge#Narrow_Gauge|NG]]), the section as far [[Kohat]] was converted to BG, 1908.
** ‘Bhara Branch Line’, 18 Miles(km) from Malakwal via Miani to Bhera, opened 1880-82 as a metre gauge([[Rail_gauge_#Metre_Gauge|MG]]) line; converted to BG 1887  
** ‘Bhara Branch Line’, 18 Miles(km) from Malakwal via Miani to Bhera, opened 1880-82 as a metre gauge([[Rail_gauge_#Metre_Gauge|MG]]) line; converted to BG 1887  
Line 65: Line 65:


'''Sind-Pishin Mainline'''
'''Sind-Pishin Mainline'''
*[[Sind-Pishin State Railway|‘Ruk-Chaman  Mainline’]], 387 miles(622km). The [[Quetta Link Railway]] was order by the British Government in 1876 as a strategic railway. The section from [[Ruk]] to [[Sibi]] opened 1880 was constructed by the SP&DR and named the [[Kandahar State Railway]], merged into NWR 1886; extended from [[Sibi]] via Mushkaf and [[Bostan]] 1887; to Lila Abdulla, 1888; reaching [[Chaman]] 1892 . The section from [[Mushkaf-Bolan Railway| Muskaf through the Bolan Pass]] was a major challenge as described in the [[Bolan Pass Railway Construction]] the track was twice washed away and finally opened after reconstruction in 1887
*[[Sind-Pishin State Railway|‘Ruk-Chaman  Mainline’]], 387 miles(622km). The [[Quetta Link Railway]] was order by the British Government in 1876 as a strategic railway. The section from Ruk] Junction to [[Sibi]] opened 1880 was constructed by the SP&DR and named the [[Kandahar State Railway]], merged into NWR 1886; extended from [[Sibi]] via Mushkaf and [[Bostan]] 1887; to Lila Abdulla, 1888; reaching [[Chaman]] 1892 . The section from [[Mushkaf-Bolan Railway| Muskaf through the Bolan Pass]] was a major challenge as described in the [[Bolan Pass Railway Construction]] the track was twice washed away and finally opened after reconstruction in 1887
** ‘[[Quetta-Nushki Branch Line]]’, 88 miles(141km),opened on November 15, 1905. An extension NWR Military Section from Spezand Junction, [[Quetta]] to [[Nushki]]. The line was extended from 1916 to respond to Military demands – see  [[Trans-Baluchistan Railway]] for details
** ‘[[Quetta-Nushki Branch Line]]’, 88 miles(141km),opened on November 15, 1905. An extension NWR Military Section from Spezand Junction, [[Quetta]] to [[Nushki]]. The line was extended from 1916 to respond to Military demands – see  [[Trans-Baluchistan Railway]] for details
** ‘Sibi-Bostan Loop Line’, 109 mile(175km), from [[Sibi]] to [[Quetta]], opened 1882 and 1887, dismantled and realigned 1897; extended to [[Bostan]], 1887; Bostan Chord opened 1898
** ‘Sibi-Bostan Loop Line’, 109 mile(175km), from [[Sibi]] to [[Quetta]], opened 1882 and 1887, dismantled and realigned 1897; extended to [[Bostan]], 1887; Bostan Chord opened 1898

Revision as of 13:22, 5 April 2020

North Western Railway - Lines operated and worked

- a sub-section of the North Western Railway (NWR) page

The NWR was formed in January 1886 from the merger of the Scinde, Punjaub & Delhi Railway(SP&DR), the Indus Valley State Railway(IVSR), the Punjab Northern State Railway(PNSR), the eastern section of the Sind-Sagar Railway and the southern section of the Sind-Pishin State Railway.

The NWR owned and operated an extensive network of railways of mixed gauge

  • Broad gauge(BG) - 3186 miles/ 5127 km (1905); 4853 miles/ 7810 km (1918); 6861 miles/11,042 km (1947)
  • Narrow gauge(NG) - 373 miles/600 km (1918)

The NWR also managed, worked and maintained a number of BG and NG lines on behalf of other parties.

The listings below are generally based on the “Administration Report on Railways 1918” [1].

NWR Commercial Section

Broad Gauge(BG). Total line length, 1918, Commercial Section - 2539 miles(4086km)

Ghaziabad- Lahore Mainline

Lahore-Peshawar Mainline

Lahore-Karachi Mainline
This NWR Mainline connecting Lahore to Karachi , 756 miles(1217km) comprised:-

  • ‘Lahore via Raiwind to Khanewa Section’, 177 miles(285km), originally the Punjaub Railway opened in 1865, merged to form SP&DR 1870, becoming NWR 1886.
    • ‘Raiwind-Bhatinda Branch Line’, 88 miles(141km), a branch from Raiwind via Kasur to Hussainiwala (on the northern bank of the River Sutlej), opened 1883 by SP&DR. The Empress Bridge over the river was completed 1887 by NWR to Ferozepore and extended in 1899 to Bhatinda
  • ‘Khanewal to Lodhran Section’, 56 miles(90km), opened by NWR 1909, reducing the route length by 29 mile(46km) and making the former mainline, which had opened by IVSR in 1865, into the ‘Khanewal-Lodhran (via Sher Shar) Chord Line’ (see below)
    • ‘Khanewal-Lodhran (via Sher Shar) Chord Line’, 85 miles(136km), from Khanewal to Multan, 1865; to Muzaffarabad , 1870; to Lodhran, 1878, formerly the IVSR Mainline, became NWR 1886. Became a NWR Chord Line In 1909 with the opening of the 29 mile shorter ‘Khanewal to Lodhran Section’ of the ‘Lahore-Karachi Mainline ’ (see above).
  • ‘Lodhran to Rohri section’, 225 miles(362km), opened 1878 by Indus Valley State Railway(IVSR), which became NWR 1886
    • ’Sukkur Bandar Branch Line’, 1.5 miles(2.4km), a branch from Sukkur on the ‘Lahore-Karachi Mainline’ to Sukkur Bandar, opened by IVSR in 1878
  • ’Rohri-Kotri Section’, 189 miles(304km), from Rohri via Hyderabad and Rahoki Junction to Kotri was completed in 1900 with the opening of the Kotri Bridge over the river Indus. This making the former mainline (see below), which had opened in 1886 into the ‘Kotri-Rohri (via Ruk) Branch Line
  • Rohri-Kotri (via Ruk) Branch Line’ from Sukkur via Ruk Junction, Larkhana and Sehwan to Kotri, completed in 1878. This line was formerly the mainline until the opening of the Kotri Bridge in 1900 to complete the NWR Mainline ’Rohri-Kotri Section’ (see above)
    • ‘Phulji Branch Line’, 3 miles(5km), from Phulji to Puranadera, opened as a branch to the ’Kotri-Rohri (via Ruk) Section’ opened by SP&DR in 1882; with short extension by NWR, 1902
  • ’Kotri to Karach Section’, 108 miles(174km), was completed in 1861 by Scinde Railway, which became SP&DR 1870 and NWR 1886

NWR Branch Lines

NWR Frontier (Military) Section

Broad Gauge(BG). Total line length, 1918, Military Section - 1151 miles(1852km)
Based on information from the 1918 “Administration Report for Railways” pages 106 and 107[1]

Sind-Sagar Mainline

  • ‘[[Lala Musa-Sher Shah Mainline]’, 342 miles(550km). Lala Musa to Malakwal, following the east bank of Indus River, opened 1880 by Sind-Sagar Railway as metre gauge(MG) converted to BG 1886 on the amalgamation into NWR. The line was extended from Malakwal via Kundian and Bhaakkar and reached Sher Shah in 1900 where it joined the ‘Lahore-Karachi Mainline’.
    • ‘Golra-Basal Section Line’, 47 Miles(75km), opened 1881 from Golra (on ‘Lahore-Peshawar Mainline’) to Basal Junction (where it joined the ‘Khushalgarh-Kohat-Thal Railway’ )
    • ‘Kohat Section Line’, 39 miles(63km), 7 miles(11km) from Jand to Khushalgarh opened 1881 as BG line; the 32 miles(52km) extension to Kohat was first opened 1902 as part of the ‘Khushalgarh-Kohat-Thal Railway’ 2ft 6in/762mm narrow gauge(NG), the section as far Kohat was converted to BG, 1908.
    • ‘Bhara Branch Line’, 18 Miles(km) from Malakwal via Miani to Bhera, opened 1880-82 as a metre gauge(MG) line; converted to BG 1887
    • ‘Bhaganwala Branch Line’, 11 miles(18km) from Haranpur to Bhaganwala, opened 1895
    • ‘Warcha Quarry Branch Line’, 8 miles(13km) from Gunjyal to Warcha, opened 1918
    • ’Dandot Branch Line’, 8.5 miles(13.6km) from Chalisa Junction via Khewra Salt Mines to Dandot, opened 1888 as a metre gauge(MG) line; converted to BG 1887-89
    • ‘Kundian-Campbellpur Section’, 119 miles(191km) from Kundian via Daud Khel to Jand opened 1892-99; Jald to Basal opened 1881 and extended to Campbellpur 1899
    • ‘Mari Branch Line’, 6.2 miles(10km), opened 1892 from Daud Khel to Mari
    • ‘Ghazi Ghat Branch Line’ 10 miles(16km), opened 1887 from Mahmud Kot to Ghazi Ghat
    • ‘Peshawar-Jamrud Branch Line’, 11 miles(18km), opened 1901 from Peshawar to Jamrud

Sind-Pishin Mainline

NWR Narrow Gauge Northern Frontier Network

In approximate chronological order

  • Mari-Attock Railway’, NG, opened 1891. Opened as part of NWR Northern Frontier narrow gauge network.
  • Khushalgarh-Kohat-Thal Railway’, NG, opened 1903 as a military railway; part of NWR Northern Frontier narrow gauge network, extended 1908.
  • Khanai-Hindubagh Railway’, NG, opened 1921. Part of the NWR Northern Frontier narrow gauge, Zhob Valley Railway network; construction commenced 1916.
  • Mari Indus Railway’, NG, constructed in 1920's as part of NWR Northern Frontier narrow gauge network.
  • Zhob Valley Railway’, NG, opened 1921. Part of NWR Northern Frontier narrow gauge network; finally extended from Boston to Zhob , 1929

Lines worked by NWR at some time

In approximate chronological order

Railways surveyed by NWR

  • Bannu Railway Survey’. Under Survey in 1909 (ref 1909 India List) by NWR on behalf of Government of India(GoI), but no evidence that it was constructed

References